HomeMy Public PortalAboutSEABREEZE LN_10.pdfDATE ISSUED: 07 -18 -2013
WORK DESCRIPTION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF
WORK LOCATION 10 SEA BREEZE LANE
OWNER NAME DOROTHY F. MOHS
ADDRESS PO BOX 2058
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2058
PHONE NUMBER
CONTRACTOR NAME ACE ROOFING
ADDRESS 5256 HWY 80 E
CITY STATE ZIP ELLABELL GA 31308
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 84.00
PROPERTY IDENTIFICATION # PIN #4- 0021 -16 -072
PROJECT VALUATION $4,800.00
PERMIT #: 130458
TOTAL BALANCE DUE: $ 84.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
2013 -07 -18 10:05 ACE ROOFING
/ -o415!
Property Address: 10 Sea 12 r - e C ,k) PIN: 17—.0 ,27' / o702'
9127283945 » 912 786 9539
P 1/1
City of Tybee Island, Georgia
912 - 472 -5030 Fax 912 -786 -9539
APPLICATION FOR BUILDING PERMIT
Ingle Family
Duplex
❑ Multi - Family units
❑ " Commercial unit(s)
■
Check ail that appry
Disoovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
C] Demolition or Relocation
C] Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
tet
Details of Project: tZ-
s -
Estimated Cost of Construction: $ gC0 - CO (materials + labor + profit/ovethead)
l
tJ2 4 -c a
:J
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
® Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee !stand.
® Also see the Tybee Island Land Development Code Article 94: Historic Preservation
Dudna -coflatrauctian:
On -site restwom facilities will be provided through 4 . Construction debris will be disposed
by 4 0.I 4/11-r-i- :44 by means of ekt > wilt` I understand that I must comply with zonlna. flood
gamaae control. buildind fire, shore protection arid ++y e tl nd ordinances, FEMA reiiulatlor, an all apPllcabie codes and
feaulations. 1 realize that f must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. 1 accept responsibility for any corrective actions
that may be necessary to restore drainage Impaired by this pe itted construction.
Date: -7 it Y1 t 3 Signature:
Printed Name of Applicant:
dote: A permit normally takes 7 to 10 days to process, Prooessino time for
piston° structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
FEES
Permit
inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mailing Address
Tele hone
Owner
�i' 4-71' S
a
1% Se-0 or
-z ,Pj
71S
Gel /: :
D?
"gam 7
- 1%(4-1
Architect or
Engineer
Office:
Cell:
Contractor
t i rq
103 `1 "tj
Q'.
ice:
con: 9
- 3 1
- utag2
Ingle Family
Duplex
❑ Multi - Family units
❑ " Commercial unit(s)
■
Check ail that appry
Disoovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
C] Demolition or Relocation
C] Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
tet
Details of Project: tZ-
s -
Estimated Cost of Construction: $ gC0 - CO (materials + labor + profit/ovethead)
l
tJ2 4 -c a
:J
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
® Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee !stand.
® Also see the Tybee Island Land Development Code Article 94: Historic Preservation
Dudna -coflatrauctian:
On -site restwom facilities will be provided through 4 . Construction debris will be disposed
by 4 0.I 4/11-r-i- :44 by means of ekt > wilt` I understand that I must comply with zonlna. flood
gamaae control. buildind fire, shore protection arid ++y e tl nd ordinances, FEMA reiiulatlor, an all apPllcabie codes and
feaulations. 1 realize that f must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. 1 accept responsibility for any corrective actions
that may be necessary to restore drainage Impaired by this pe itted construction.
Date: -7 it Y1 t 3 Signature:
Printed Name of Applicant:
dote: A permit normally takes 7 to 10 days to process, Prooessino time for
piston° structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
FEES
Permit
inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
2013 -07 -18 10:08
ACE ROOFING 9127283945 >>
912 786 9539 P 1/1
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: important Lead Hazard.Ittimesto fir f fmillIs. Child Care Providers. and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 8 ft2 per Interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size,
Asbestos /Environmental Notification to Georgia EPD for
Projects Involvino Demolition, Wrsckino, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
BMP,
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and $d1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
tltlp. / /wwwgaswcc.org /does /fieId_rnanual_4ed.pdt.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood po post soacino. Tvpe C or
Signature for receipt of Lead Paint, Asbestos,
Printed Name
7ft g 1 / 3
Dare
Chatham County Board of Assessors: 2013 Property Record Card 4- 0021 -16 -072 Page 1 of 2
2013 Chatham County Board of Assessors
Property Record Card
[APPRAISER MWTHOMAS LOT 22A SUB OF LOT 22 CAPTAIN'S ROW SUB SMB 16S 41 .111 ac
LAST INSP 03/18/2013
APPR ZONE 000008
SALES BOOK/ INS VI QU RSN PRICE
PAGE
22 Dec 347C 0813 QC I U UR
2008
GRANTOR:MOHS DOROTHY F
GRANTEE.MOHS JAMES A & DOROTHY F*
21 Aug 187T 0076 QC I U U5
1997
GRANTOR: MOHS JAMES A & DOROTHY F
GRANTEE:MOHS DOROTHY F
09 May 185Q 0451 WD I Q 205,000
1997
GRANTOR.:HOGAN DEVELOPMENT INC
GRANTEE:MOHS JAMES A & DOROTHY F
PERMITS TYPE DATE AMOUNT
120361 GM 26 Jun 2012 Issued 4,040
1100562 GM 06 Dec 2010 Issued 800
COMMENTS:
17 Feb 2009 TY09 RET VAL ENT 2/17/09
LHN
15 Jan 2009 1997 NEW PIN; SPLIT OUT OF
15 Jan 2009 *TY09 SURVS
02 Nov 2005 TY06 10S ENT 11/2/05 APW
REQ HS REM FROM COBB
CNTY APW
20 Aug 1997 QC /D 185Q449 5 -23 -97 98
SURVS
05 Dec 1996 4- 21 -16 -32 12/5/96
4 -0021 -16 -072
10 SEA BREEZE LN TYBEE ISLAND
MOHS JAMES A & DOROTHY F* CAMA ASMT
PO BOX2058 192,200 192,200 LAND 1
TYBEE ISLAND GA 31328 213,600 213,600 BLDG 1
OBXF 0
405,800 405,800 Cost - MS
[Click for larger picture]
LAND
Chatham County
Tax Commissioner
/ Property Tax StaternEnt
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 003030.00 C030 CAPTAINS
ROW TY
EXEMPTIONS L1 L9 S1 L8
HISTORY LAND IMPR TOTAL
2012 248,100 170,500 418,600 Over
2012 192,200 193,400 385,600 Cama
2011 248,100 193,400 441,500 Cama
2011 248,100 170,500 418,600 Over
2010 248,100 193,400 441,500 Cama
2009 223,500 251,500 475,000 Over
2008 310,000 319,500 629,500 Over
2007 629,500 A/C
2006 145,500 316,000 461,500 Over
2005 145,500 316,000 461,500 Over
2004 461,500 A/C
2003 251,500 251,500 Over
2002 251,500 251,500 Over
2001 251,500 A/C
2000 41,000 166,000 207,000 Cama
1999 207,000 A/C
1998 205,000 A/C
1997 30,500 151,000 181,500 Cama
ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
112101 SINGLE FAMILY RES 57 85 4,845.00 -SF 39.68 R2 192200
http: //boa. chath am county. org /DesktopModules /ChathamCounty /BoardofAssessors /Propert... 7/18/2013
Chatham County Board of Assessors: 2013 Property Record Card 4- 0021 -16 -072 Page 2 of 2
2013 Chatham County Board of Assessors 4- 0021 -16 -072
Property Record Card 10 SEA BREEZE LN TYBEE ISLAND
BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
87130 -1 -2013 1Residential 254,329 1996 MS 16.00 0.00 0.00 0.00 16.00 213,636 213,600
8 14'
903
Woad Deck
192
24 in 907 2,
Enclosed' Porch Scree]
192
904
Slat Porch with 1
192
8'
10'
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS/ BATHS
1 - Main
1872
5 - Duplex
1 - Stud Frame
2 - Two Story
5.00
3.00
0
3 1 2.10
COMPONENTS Units % QUAL
R1 108 Frame, Siding, Wood 100.00
R2 208 Composition Shingle 100.00
R3 352 Heat Pump 100.00
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #) 11.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 622 Raised Subfloor (% or SF) 100.00
R6 642 Single 2 -Story Fireplace ( #) 1.00
R7 711 Built -in Garage (SF) 576.00
R11 903 Wood Deck (SF) 336.00
R11 903 Wood Deck (SF) 192.00
R11 904 Slab Porch (SF) with Roof 192.00
R11 904 Slab Porch (SF) with Roof 30.00
R11 904 Slab Porch (SF) with Roof 672.00
R11 907 Enclosed Porch (SF), Screened Walls 192.00
http: //boa. chathamcounty. org/ DesktopModules /ChathamCounty /BoardofAssessors /Propert... 7/18/2013