HomeMy Public PortalAboutTENTH PL_6 (2).pdfCity of Tybee Island • Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
Permit No. /3- 2'2 4L
Date Requested 1,9 7/17/13
r; s-r-
INTERNATIONAL
CODE COUNCIL
MEMBER
Owner's Name ,r s A/7 (tilt_ /C7 Date Needed D 7i /% j/ 3
� '
Gen. Contractor �J, l... f" ,I-h i `f Subcontractor
Contact Information s /1 /t .f� %�3tit "� '7 7 7
Project Address 70 I ir m T.
Scope of Work A7 il L21.1 r- -4. o4i Pd'C J-f
Inspector ;7 ± Date of Inspection A'` ` /,��
Inspection F!,'/ — Pass Fee e
Inspection Pass
Fail D Fee
Inspection Pass I Fail ® Fee
Inspection Pass ---� Fain
Fee
DATE ISSUED: 07 -15 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R BEAM ON FRONT PORCH
6 TENTH PL
ETHYL ROSENZWEIG
122 W HUNTINGDON ST
SAVANNAH GA 31401
J.G. FEEHLEY CONSTRUCTION
306 JACKSON WOODS BLVD
SAVANNAH GA 31405
P
$ 50.00
PIN #4- 0006 -17 -006
$ 500.00
PERMIT #: 130449
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
a 15'r tzfi'-
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Chatham County Board of Ass
Drs: 2013 Property Record Card 4 -00(' - 1.7 -006
2013 Chatham County Board of Assessors
Property Record Card
Page 1 of 2
4- 0006 -17 -006
6 10TH PL TYBEE ISLAND
APPRAISER
LAST INSP
APPR ZONE
ALCUMMIN
01/09/2012
000008
PARCEL B SUB 6 WD 3 TYBEE
ROSENZWEIG ETHEL R 1 CAMA
122 W HUNTINGDON ST 245,300
SAVANNAH GA 31401 -4876 131,700
ASMT
245,300
131,700
2,500 2,500
1379,500 379,500
LAND 1
BLDG 1
OBXF 1
Cost - MS
SALES
01 Aug 1977
GRANTOR:
GRANTEE:
BOOK / INS VI QU RSN PRICE
PAGE
I U UO 32,500
PERMITS TYPE DATE AMOUNT
110514 09 Jan 2012 Comp 1,000
10 -0054 HT 21 Jun 2010 Comp 5,760
COMMENTS:
03 Dec 2012
30 Oct 2012
25 Oct 2012
29 Jul 2008
TY13 10S, L8 REM DUE TO NO
RESPONSE TO HS REM
LETTER
HS LETTER SENT PER
CHANGE OF ADD 10/30/12
ADD CHG PER USPS 9/20/12
ADD CHG PER LTR 07/29/08
DLB
EXTRA FEATURES
ID# BLDG # SYSTEM DESC
138671 85440 Slab w /walls Under
[Click for larger picture]
6A G19
Chatham County
Tax Commissioner
Property Tax Statement
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA
NBHD
EXEMPTIONS
0004 Tybee Island
020213.00 T213 TYBEE BTL
BEACH
HISTORY LAND IMPR TOTAL
2012 245,300 86,600 331,900
2011 245,300 8 .11
327,700
2010 518,2tI 79,600 7,800
2009 518,01. 010 599,000
2008 797,000 86,500 883,500
2007 797,000 73,500 870,500
2006 643,500 60,500 704,000
2005 479,000 79,500 558,500
2004 347,500 81,500 429,000
2003 347,500 82,000 429,500
2002 231,000 231,000
2001 231,000 231,000
2000 231,000
1999 73,500 71,000 144,500
1998 73,500 68,500 142,000
1997 73,500 62,500 136,000
1996 26,680 50,270 76,950
1995 26,680 52,780 79,460
1994 26,680 47,870 74,550
1993 26,680 50,390 77,070
1992 26,680 50,390 77,070
Cama
Cama
Cama
Over
Cama
Cama
Cama
Cama
Cama
Cama
Over
Over
A/C
Cama
Cama
Cama
Cama
Cama
Cama
Over
Over
DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
28 9 252.00 A 16.48 4,153 1980 1980 IR 2,492 2,500
LAND
ID# USE DESC
109839 SINGLE FAMILY RES
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
0 0 6,132.00 -SF 40.00 R2 245300
to- 00s- 4*5, ?--0
U- Ds-- 4 Et11000
5`'°
4-72 to 0
t o 4--le r
http: // boa. chathamcounty. org /DesktopModules /ChathamCounty /B oardofAssessors /Propert... 7/15/2013
Chatham County Board of A ssors: 2013 Property Record Card 4 -0
2013 Chatham County Board of Assessors
Property Record Card
-17 -006 Page 2 of 2
4- 0006 -17 -006
6 10TH PL TYBEE ISLAND
BUILDING SECTION !CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / %
85440 -1 -2013 'Residential 112,324 1968 1990 MS 23.00 0.00 0.00 0.00
20
8'
11'
7 •907
Enclosed Porch Screened Walls
580
•721
Carport }tat Roof
580
32'
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
COMPONENTS
R1 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 621 Slab on Grade (% or SF)
R7 721 Carport, Flat Roof (SF)
R7 721 Carport, Flat Roof (SF)
R11 901 Open Slab Porch (SF)
R11 901 Open Slab Porch (SF)
R11 903 Wood Deck (SF)
R11 907 Enclosed Porch (SF), Screened Walls
TOTAL DEP % RCNLD U.FACTOR MKT VAL
23.00 86,489 1.05 131,700
1 - Main
1120
1 - Single - family Residence
1 - Stud Frame
1 - One Story
3.00
3.00
0
3/1.00
Units % QUAL
100.00
100.00
100.00
5.00
1.00
100.00
580.00
209.00
202.00
279.00
202.00
580.00
http: // boa. chathamcounty. org /DesktopModules /ChathamCounty /B oardofAssessors /Propert... 7/15/2013
Y u
Property Address.
City of Tybee Island, Georgia
912 - 472 -5030 • Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN:
C C NS L 10) -) Check all that apply
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
D°24•3/ Discovery /Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
El Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Z�GE
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: R(Vg Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through V� [ (1 \ZOD),1. Construction debris will be disposed
by e by means of i\i't . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: 1,1 S 6 Signature:
Printed ame of Applicant:
ASS`(. !�L
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
• Signatur Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mailing Address
Telephone
Owner
% -L
1rN ac:�
Home:
Cell:
Architect or
Engineer
Office:
Cell:
Contractor
� �UN
J)� s lr \- C ) Ux%
Office: 0) LL - 3.s-2.- \ Q3
Cell: 9 t--4_ - 7:-R- i cY l
C C NS L 10) -) Check all that apply
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
D°24•3/ Discovery /Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
El Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Z�GE
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: R(Vg Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through V� [ (1 \ZOD),1. Construction debris will be disposed
by e by means of i\i't . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: 1,1 S 6 Signature:
Printed ame of Applicant:
ASS`(. !�L
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
• Signatur Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http:// www. gaswcc .org /docs /field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts • - - pan., pe C or A.
Signatu - • - - • •i"d Paint, Asbestos, and BMP notices
;J1\i\-1��
Printed Name
\3
Date