Loading...
HomeMy Public PortalAboutTENTH PL_6 (2).pdfCity of Tybee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 Permit No. /3- 2'2 4L Date Requested 1,9 7/17/13 r; s-r- INTERNATIONAL CODE COUNCIL MEMBER Owner's Name ,r s A/7 (tilt_ /C7 Date Needed D 7i /% j/ 3 � ' Gen. Contractor �J, l... f" ,I-h i `f Subcontractor Contact Information s /1 /t .f� %�3tit "� '7 7 7 Project Address 70 I ir m T. Scope of Work A7 il L21.1 r- -4. o4i Pd'C J-f Inspector ;7 ± Date of Inspection A'` ` /,�� Inspection F!,'/ — Pass Fee e Inspection Pass Fail D Fee Inspection Pass I Fail ® Fee Inspection Pass ---� Fain Fee DATE ISSUED: 07 -15 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT R &R BEAM ON FRONT PORCH 6 TENTH PL ETHYL ROSENZWEIG 122 W HUNTINGDON ST SAVANNAH GA 31401 J.G. FEEHLEY CONSTRUCTION 306 JACKSON WOODS BLVD SAVANNAH GA 31405 P $ 50.00 PIN #4- 0006 -17 -006 $ 500.00 PERMIT #: 130449 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether Local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: a 15'r tzfi'- P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Chatham County Board of Ass Drs: 2013 Property Record Card 4 -00(' - 1.7 -006 2013 Chatham County Board of Assessors Property Record Card Page 1 of 2 4- 0006 -17 -006 6 10TH PL TYBEE ISLAND APPRAISER LAST INSP APPR ZONE ALCUMMIN 01/09/2012 000008 PARCEL B SUB 6 WD 3 TYBEE ROSENZWEIG ETHEL R 1 CAMA 122 W HUNTINGDON ST 245,300 SAVANNAH GA 31401 -4876 131,700 ASMT 245,300 131,700 2,500 2,500 1379,500 379,500 LAND 1 BLDG 1 OBXF 1 Cost - MS SALES 01 Aug 1977 GRANTOR: GRANTEE: BOOK / INS VI QU RSN PRICE PAGE I U UO 32,500 PERMITS TYPE DATE AMOUNT 110514 09 Jan 2012 Comp 1,000 10 -0054 HT 21 Jun 2010 Comp 5,760 COMMENTS: 03 Dec 2012 30 Oct 2012 25 Oct 2012 29 Jul 2008 TY13 10S, L8 REM DUE TO NO RESPONSE TO HS REM LETTER HS LETTER SENT PER CHANGE OF ADD 10/30/12 ADD CHG PER USPS 9/20/12 ADD CHG PER LTR 07/29/08 DLB EXTRA FEATURES ID# BLDG # SYSTEM DESC 138671 85440 Slab w /walls Under [Click for larger picture] 6A G19 Chatham County Tax Commissioner Property Tax Statement CODES PROPERTY 0006 RESIDENTIAL USE UTA NBHD EXEMPTIONS 0004 Tybee Island 020213.00 T213 TYBEE BTL BEACH HISTORY LAND IMPR TOTAL 2012 245,300 86,600 331,900 2011 245,300 8 .11 327,700 2010 518,2tI 79,600 7,800 2009 518,01. 010 599,000 2008 797,000 86,500 883,500 2007 797,000 73,500 870,500 2006 643,500 60,500 704,000 2005 479,000 79,500 558,500 2004 347,500 81,500 429,000 2003 347,500 82,000 429,500 2002 231,000 231,000 2001 231,000 231,000 2000 231,000 1999 73,500 71,000 144,500 1998 73,500 68,500 142,000 1997 73,500 62,500 136,000 1996 26,680 50,270 76,950 1995 26,680 52,780 79,460 1994 26,680 47,870 74,550 1993 26,680 50,390 77,070 1992 26,680 50,390 77,070 Cama Cama Cama Over Cama Cama Cama Cama Cama Cama Over Over A/C Cama Cama Cama Cama Cama Cama Over Over DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 28 9 252.00 A 16.48 4,153 1980 1980 IR 2,492 2,500 LAND ID# USE DESC 109839 SINGLE FAMILY RES FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 0 0 6,132.00 -SF 40.00 R2 245300 to- 00s- 4*5, ?--0 U- Ds-- 4 Et11000 5`'° 4-72 to 0 t o 4--le r http: // boa. chathamcounty. org /DesktopModules /ChathamCounty /B oardofAssessors /Propert... 7/15/2013 Chatham County Board of A ssors: 2013 Property Record Card 4 -0 2013 Chatham County Board of Assessors Property Record Card -17 -006 Page 2 of 2 4- 0006 -17 -006 6 10TH PL TYBEE ISLAND BUILDING SECTION !CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % 85440 -1 -2013 'Residential 112,324 1968 1990 MS 23.00 0.00 0.00 0.00 20 8' 11' 7 •907 Enclosed Porch Screened Walls 580 •721 Carport }tat Roof 580 32' [Click for larger picture] SECTION TYPE AREA TYPE FRAME STYLE QUALITY CONDITION # UNITS # OF BEDS / BATHS COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 621 Slab on Grade (% or SF) R7 721 Carport, Flat Roof (SF) R7 721 Carport, Flat Roof (SF) R11 901 Open Slab Porch (SF) R11 901 Open Slab Porch (SF) R11 903 Wood Deck (SF) R11 907 Enclosed Porch (SF), Screened Walls TOTAL DEP % RCNLD U.FACTOR MKT VAL 23.00 86,489 1.05 131,700 1 - Main 1120 1 - Single - family Residence 1 - Stud Frame 1 - One Story 3.00 3.00 0 3/1.00 Units % QUAL 100.00 100.00 100.00 5.00 1.00 100.00 580.00 209.00 202.00 279.00 202.00 580.00 http: // boa. chathamcounty. org /DesktopModules /ChathamCounty /B oardofAssessors /Propert... 7/15/2013 Y u Property Address. City of Tybee Island, Georgia 912 - 472 -5030 • Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT PIN: C C NS L 10) -) Check all that apply ❑ Single Family ❑ Duplex ❑ Multi - Family units ❑ * Commercial unit(s) D°24•3/ Discovery /Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation El Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Z�GE Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: R(Vg Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through V� [ (1 \ZOD),1. Construction debris will be disposed by e by means of i\i't . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: 1,1 S 6 Signature: Printed ame of Applicant: ASS`(. !�L Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager • Signatur Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name Mailing Address Telephone Owner % -L 1rN ac:� Home: Cell: Architect or Engineer Office: Cell: Contractor � �UN J)� s lr \- C ) Ux% Office: 0) LL - 3.s-2.- \ Q3 Cell: 9 t--4_ - 7:-R- i cY l C C NS L 10) -) Check all that apply ❑ Single Family ❑ Duplex ❑ Multi - Family units ❑ * Commercial unit(s) D°24•3/ Discovery /Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation El Other * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: Z�GE Estimated Cost of Construction: $ (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: R(Vg Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through V� [ (1 \ZOD),1. Construction debris will be disposed by e by means of i\i't . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: 1,1 S 6 Signature: Printed ame of Applicant: ASS`(. !�L Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager • Signatur Date FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http:// www. gaswcc .org /docs /field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts • - - pan., pe C or A. Signatu - • - - • •i"d Paint, Asbestos, and BMP notices ;J1\i\-1�� Printed Name \3 Date