Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
1991-1992 Resurfacing & Street and Storm Drain Improvements
1993-94 Community Development Block Grant (CDBG) Repair and Reconstruction of Norfolk Street, Second Avenue, and Third Avenue
1994-95 Base Failure Repair and Street Improvement : Phase 2
1996-97 Base Failure Repair and Street Resurfacing: Phase 1
1998-99 Street Improvements Monte Diablo Avenue From Quebec to East End
1999/2000 Base Failure Repair And Street Resurfacing: Phase 1
1999/2000 Base Failure Repair and Street Resurfacing: Phase 2
2000/2001 Base Failure Repair and Street Resurfacing Project Phase 1
2001/2002 Base Failure Repair and Street Resurfacing Project Phase 1
2001-2002 Base Failure Repair & Street Resurfacing- Phase 2
2001-2002 City Wide Street Slurry Seal Phase 1
2002-2003 Base Failure Repair & Street Resurfacing- Phase 1, #09-90-89-12-30
2002-2003 Base Failure Repair & Street Resurfacing- Phase 2
2003 City Wide Street Slurry Seal - Phase 2
2003 City Wide Street Slurry Seal- Phase 1
2003 Citywide Rubberized Chip Seal Project
2003 Citywide Street Base Failure Repair Project
2003/04 Base Failure Repair and Street Resurfacing Phase 2
2003-04 Citywide Base Failure Repair and Street Rehabilitation Project
2003-2004 Base Failure Repair and Street Rehabilitation Project - Phase III
2003-2004 Base Failure Repair and Street Resurfacing- Phase 1
2004 Citywide Cape Seal Project
2004 Citywide Cape Seal Project (3)
2004/05 Street Rehabilitation Project- Phase 2
2004-05 Base Failure Repair and Street Rehabilitation Project- Phase 1
2005 Citywide Base Failure Repair and Street Resurfacing
2005 Community Development Block Grant- Street Rehabilitation
2005-2006 Base Failure Repair and Street Resurfacing- Phase 2
2006 Citywide Base Failure Repair
2006 Citywide Striping
2006 Downtown Street Resurfacing
2006 Slurry Seal and Cape Seal Project
2006 Street Resurfacing at Various Locations
2007 Citywide Base Failure Repair
2007 Citywide Slurry Seal and Cape Seal Project
2007 Citywide Striping Project- Phase 2
2007 Downtown Street Resurfacing
2007 Street Rehabilitation
2007 Street Rehabilitation at Various Locations- Phase 2
2007 Street Resurfacing
2008 Citywide Slurry Seal and Cape Seal Project
2008 Citywide Striping Project- Phase 3
2008 Street Reconstruction
2008 Street Resurfacing Phase 2
2008 Street Resurfacing Phase I
2009 Citywide Base Failure Repair
2009 Citywide Base Failure Repair (10)
2009 Citywide Base Failure Repair (11)
2009 Citywide Base Failure Repair (12)
2009 Citywide Base Failure Repair (13)
2009 Citywide Base Failure Repair (14)
2009 Citywide Base Failure Repair (15)
2009 Citywide Base Failure Repair (16)
2009 Citywide Base Failure Repair, #467004-46000-7039
2009 Street Reconstruction
2009 Street Reconstruction - Phase 2
2009 Street Reconstruction - Phase 2 (3)
2009 Street Reconstruction (3)
2009 Street Rehabilitation At Various Locations on Federal Aid Routes
2009 Street Rehabilitation at Various Locations on Federal Aid Routes - Phase 2
2009 Street Resurfacing - Phase 1
2009 Street Resurfacing - Phase 1 (10)
2009 Street Resurfacing - Phase 1 (11)
2009 Street Resurfacing - Phase 1 (12)
2009 Street Resurfacing - Phase 1 (13)
2009 Street Resurfacing - Phase 1 (14)
2009 Street Resurfacing - Phase 1 (15)
2009 Street Resurfacing - Phase 1 (9)
2009 Street Resurfacing- Phase 1
2009 Street Resurfacing- Phase 2
2010 Citywide Base Failure Repair
2010 Citywide Slurry Seal Project
2010 Street Resurfacing Phase 1
2012 Street Resurfacing Phase II
2013 Citywide Base Failure Repair
2013-2014 Street Rehabilitation Phase II
2014 Citywide Slurry Seal Project
22nd Avenue Street Reconstruction
Alameda De Las Pulgas Rehabilitation
Annual Street Resurfacing and Street Improvements 1990-91
Bike Lane Crystal Springs Road From Tulane Road to El Cerrito Avenue
Bike Lane Crystal Springs Road From Tulane Road to El Cerrito Avenue,
Cavanagh Street Reconstruction, #467774-46000-7705
Delaware Street Improvement Federal Aid Project No. CML-5102 (032)
Detroit Drive Relocation From Third Avenue To Detriot Drive
East Third Avenue Widening - West Embankment,
East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Seal Slough Bridge
East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage 3,
East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage One - Southwest Embankment
East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage one- East Embankment
East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage Two, #90-8509-02
East Third Avenue Widening Stage One
East Third Avenue Widening Stage One (Phase Two)
East Third Avenue Widening, Bayshore Freeway To San Mateo Creek
El Camino Real From St. Mathews To Second Avenue Rule 20A Joint Trench- Underground Conduit Installation,
El Camino Real Resurfacing Between State Route 92 and 31st Avenue Federal Aid Project No. STPL-5102(017) #09-90-39.30
Elm Street Reconstruction - Phase 2 and Tilton Avenue Street Resurfacing
Elm Street Reconstruction, Phase 1, and Traffic Island Barrier at East Poplar and North Ellsworth
Fashion Island Boulevard Bike Path
Fremont Street Reconstruction 2nd Avenue to Cypress Avenue
Fremont Street Reconstruction From Monte Diablo To Santa Inez Community Development Block Grant (CDBG)
Hillsdale Boulevard Widening Norfork Street East
J. Hart Clinton Drive Rehabilitation
Monte Diablo Avenue Reconrtruction
Norfolk Street Rehabilitation / Streetscape Project
North B Street Improvement Initiative Project
North Delaware Street Resurfacing Federal Aid Project No. STPL-5102 (021) #09-90-31.32
Pacific Boulevard Extension
Parrott Drive At Verano Court Street Rehabilitation
Patricia Avenue Reconstruction- Phase 1
Poplar Avenue (So. Side) Adjacent to Lot 2, Block 7B of the Western Addition- Street Improvement
Railroad Grade Separation- 25th Avenue Grade Separation- 1994- 2001
Reconstruction of Fifth Avenue Between Claremont Street and Railroad Avenue
Second Avenue At El Camino Real Improvements
Second Avenue At El Camino Real Improvements (4)
Shasta Drive Cul-De-Sac Improvements
Street Improv - Bike - Citywide Bikeways Master Plan
Street Improv - North Central Pedestrian Infrastructure
Street Improvements, Pedestrian, Citywide Pedestrian Master Plan
Street Reconstruction Engineering Consultant Services
The Roadway Widening, Channelization, and Signalization of Hillsdale Boulevard and El Camino Real
West Hillsdale Boulevard Widening SR- 92 to Campus Drive