Loading...
HomeSearchMy Public PortalAbout1991-1992 Resurfacing & Street and Storm Drain Improvements1993-94 Community Development Block Grant (CDBG) Repair and Reconstruction of Norfolk Street, Second Avenue, and Third Avenue1994-95 Base Failure Repair and Street Improvement : Phase 21996-97 Base Failure Repair and Street Resurfacing: Phase 11998-99 Street Improvements Monte Diablo Avenue From Quebec to East End1999/2000 Base Failure Repair And Street Resurfacing: Phase 11999/2000 Base Failure Repair and Street Resurfacing: Phase 22000/2001 Base Failure Repair and Street Resurfacing Project Phase 12001/2002 Base Failure Repair and Street Resurfacing Project Phase 12001-2002 Base Failure Repair & Street Resurfacing- Phase 22001-2002 City Wide Street Slurry Seal Phase 12002-2003 Base Failure Repair & Street Resurfacing- Phase 1, #09-90-89-12-302002-2003 Base Failure Repair & Street Resurfacing- Phase 22003 City Wide Street Slurry Seal - Phase 22003 City Wide Street Slurry Seal- Phase 12003 Citywide Rubberized Chip Seal Project2003 Citywide Street Base Failure Repair Project2003/04 Base Failure Repair and Street Resurfacing Phase 22003-04 Citywide Base Failure Repair and Street Rehabilitation Project2003-2004 Base Failure Repair and Street Rehabilitation Project - Phase III2003-2004 Base Failure Repair and Street Resurfacing- Phase 12004 Citywide Cape Seal Project2004 Citywide Cape Seal Project (3)2004/05 Street Rehabilitation Project- Phase 22004-05 Base Failure Repair and Street Rehabilitation Project- Phase 12005 Citywide Base Failure Repair and Street Resurfacing2005 Community Development Block Grant- Street Rehabilitation2005-2006 Base Failure Repair and Street Resurfacing- Phase 22006 Citywide Base Failure Repair2006 Citywide Striping2006 Downtown Street Resurfacing2006 Slurry Seal and Cape Seal Project2006 Street Resurfacing at Various Locations2007 Citywide Base Failure Repair2007 Citywide Slurry Seal and Cape Seal Project2007 Citywide Striping Project- Phase 22007 Downtown Street Resurfacing2007 Street Rehabilitation2007 Street Rehabilitation at Various Locations- Phase 22007 Street Resurfacing2008 Citywide Slurry Seal and Cape Seal Project2008 Citywide Striping Project- Phase 32008 Street Reconstruction2008 Street Resurfacing Phase 22008 Street Resurfacing Phase I2009 Citywide Base Failure Repair2009 Citywide Base Failure Repair (10)2009 Citywide Base Failure Repair (11)2009 Citywide Base Failure Repair (12)2009 Citywide Base Failure Repair (13)2009 Citywide Base Failure Repair (14)2009 Citywide Base Failure Repair (15)2009 Citywide Base Failure Repair (16)2009 Citywide Base Failure Repair, #467004-46000-70392009 Street Reconstruction2009 Street Reconstruction - Phase 22009 Street Reconstruction - Phase 2 (3)2009 Street Reconstruction (3)2009 Street Rehabilitation At Various Locations on Federal Aid Routes2009 Street Rehabilitation at Various Locations on Federal Aid Routes - Phase 22009 Street Resurfacing - Phase 12009 Street Resurfacing - Phase 1 (10)2009 Street Resurfacing - Phase 1 (11)2009 Street Resurfacing - Phase 1 (12)2009 Street Resurfacing - Phase 1 (13)2009 Street Resurfacing - Phase 1 (14)2009 Street Resurfacing - Phase 1 (15)2009 Street Resurfacing - Phase 1 (9)2009 Street Resurfacing- Phase 12009 Street Resurfacing- Phase 22010 Citywide Base Failure Repair2010 Citywide Slurry Seal Project2010 Street Resurfacing Phase 12012 Street Resurfacing Phase II2013 Citywide Base Failure Repair2013-2014 Street Rehabilitation Phase II2014 Citywide Slurry Seal Project22nd Avenue Street ReconstructionAlameda De Las Pulgas RehabilitationAnnual Street Resurfacing and Street Improvements 1990-91Bike Lane Crystal Springs Road From Tulane Road to El Cerrito AvenueBike Lane Crystal Springs Road From Tulane Road to El Cerrito Avenue,Cavanagh Street Reconstruction, #467774-46000-7705Delaware Street Improvement Federal Aid Project No. CML-5102 (032)Detroit Drive Relocation From Third Avenue To Detriot DriveEast Third Avenue Widening - West Embankment,East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Seal Slough BridgeEast Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage 3,East Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage One - Southwest EmbankmentEast Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage one- East EmbankmentEast Third Avenue Widening Norfolk Street to Mariner's Island Boulevard Stage Two, #90-8509-02East Third Avenue Widening Stage OneEast Third Avenue Widening Stage One (Phase Two)East Third Avenue Widening, Bayshore Freeway To San Mateo CreekEl Camino Real From St. Mathews To Second Avenue Rule 20A Joint Trench- Underground Conduit Installation,El Camino Real Resurfacing Between State Route 92 and 31st Avenue Federal Aid Project No. STPL-5102(017) #09-90-39.30Elm Street Reconstruction - Phase 2 and Tilton Avenue Street ResurfacingElm Street Reconstruction, Phase 1, and Traffic Island Barrier at East Poplar and North EllsworthFashion Island Boulevard Bike PathFremont Street Reconstruction 2nd Avenue to Cypress AvenueFremont Street Reconstruction From Monte Diablo To Santa Inez Community Development Block Grant (CDBG)Hillsdale Boulevard Widening Norfork Street EastJ. Hart Clinton Drive RehabilitationMonte Diablo Avenue ReconrtructionNorfolk Street Rehabilitation / Streetscape ProjectNorth B Street Improvement Initiative ProjectNorth Delaware Street Resurfacing Federal Aid Project No. STPL-5102 (021) #09-90-31.32Pacific Boulevard ExtensionParrott Drive At Verano Court Street RehabilitationPatricia Avenue Reconstruction- Phase 1Poplar Avenue (So. Side) Adjacent to Lot 2, Block 7B of the Western Addition- Street ImprovementRailroad Grade Separation- 25th Avenue Grade Separation- 1994- 2001Reconstruction of Fifth Avenue Between Claremont Street and Railroad AvenueSecond Avenue At El Camino Real ImprovementsSecond Avenue At El Camino Real Improvements (4)Shasta Drive Cul-De-Sac ImprovementsStreet Improv - Bike - Citywide Bikeways Master PlanStreet Improv - North Central Pedestrian InfrastructureStreet Improvements, Pedestrian, Citywide Pedestrian Master PlanStreet Reconstruction Engineering Consultant ServicesThe Roadway Widening, Channelization, and Signalization of Hillsdale Boulevard and El Camino RealWest Hillsdale Boulevard Widening SR- 92 to Campus Drive