Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
16-001.10 Special Provisions-2020-024 Final Book dbl sided
2017 Blank W9
2019 Pavement Marking - Contract Specifications FINAL
20190501_2019 Roadway Rehab DRAWINGS
2019-069 CS Improvements at Three Locations_Bid Book
2020 Complete Streets Improvements at Three Locations 2020-024 legal add
2020 Complete Streets Improvements at Three Locations 2020-024 legal add_1
2020 Complete Streets Improvements at Three Locations 2020-024 legal add_2
2020-005 Avon Road Utility Improvement_Bid Book
2020-005 Avon Road Utility Improvement_Plan Set
2020-005_Avon Road Utility Improvement Project_Legal Ad (002)
2020-008 - Sidewalk Repair - Contract-ALL DBLE SIDE
2020-025_Road Rehab Project Phase I_Legal Ad
2020-025_Road Rehab Project Phase I_Legal Ad_1
2020-025_Road Rehab Project Phase I_Legal Ad_1_2
2020-026_Road Rehab Project Phase II_Legal Ad
2020-026_Road Rehab Project Phase II_Legal Ad_1
614.1
614.14 WMS Boys 100 CD Bid Set Drawings
614.14 WMS Boys Locker Room 100 CD Specifications
Addendum 1 Filippello Sportsfield Lighting Project
ADDENDUM 1 LAMINATE FLOORING MS 5.21.19
Addendum 2 MS Laminate Flooring
Addendum 3 MS Laminate Flooring
Bidders Notice
Bike-Ped rfp 4-23-19 rb
CERTIFICATE NON-COLLUSION and Taxes and VOTE
Contract 2019-063 Traffic signal maintenance dbl side FINAL
CPC RFQ FINAL 7.12.19
Filippello Park Sports Field Lighting Project Drawings
Filippello Park Sports Field Lighting Project Specifications
Fillippelo Park Legal Ad
Final Advertisement to Bid MS Locker Room 1.7.2020
IFB FINAL MS 1ST FLOOR FLOORING 9.11.19
Legal Ad MS Bathroom Project
Legal Ad MS Flooring First Floor
LEGAL AD RFQ CPC Consultant 6.28.19
Legal Ad Sewer Project 7.3.19
Legal notice for GC SC Prequalifications Hosmer.Cunniff
MS BATHROOM RENOV. 2ND FLOOR IFB FINAL
MS BATHROOM RENOVATION 2ND FLOOR ADDENDUM 1
MS FIRST FLOOR LAMINATE FLOORING ADDENDUM 1
MS FLOORING SPEC. FINAL
ON CALL ARCHITECT ADDENDUM NO. 2
On Call Architectural Design Addendum 1
On Call Painting Final 10.08.19
Phase 1 plans
RFP for On-call architectural services 2019 Final
RFP for On-call architectural services 2019 Final_1
RFP for Ordinance and Job Descriptions reviews 6-2019
RFP Watertown Ordinance and Job Description Review Final 6.20.19
top 3 filippello lighting
Town of Watertown GC PREQUAL
Town of Watertown SC Prequalifications
Wage Rates WMS Locker room
Watertown - Contract 2019-061 Rd Rehab FINAL
Watertown - Contract 2020-025 Rd Rehab COMPILED
Watertown - Contract 2020-026 Rd Rehab final
Watertown 19-01S Addendum 1
Watertown, MA - CIP 1 Rehabs_Plans
Watertown, MA - CIP 1 Rehabs_Specs 18-01S