Loading...
HomeSearchMy Public PortalAboutAs-BuiltBikeBridgeChange OrderCity PropertyContract DocumentsCounty PropertyCreeksEast Third Avenue LandfillLocation MapMarina LagoonMiscellaneousParkPrivate DevelopmentProject FilesProject PlansProposalsProposals (2)Public UtilitiesRailroadSanitaryStandard DrawingsState HighwayStormStreet ImprovementStudiesStudyTBDTrafficWastewater Treatment Plant15" RCP Grade Revisions at South B Street between 9th Ave, & 16th Ave.16th Avenue Channel Improvements - HWY 101 to Marina Lagoon16th Avenue Channel Lining - Railroad to Delaware Street16th Avenue Ditch - Southern Pacific Railroad To Bayshore Freeway16th Avenue Drainage Culvert Proposed1984 Drainage Improvements - Citywide19th Avenue Drainage Ditch For Pump Station19th Avenue Proposed Storm and Sanitary Easement1st & Railroad Avenue Parking Lot Extension2004 Community Development Block Grant Sidewalk Improvements, Project No. 4612122007 CDBG Curb Ramp & Sidewalk Installations2011 CDBG Curb Ramp & Sidewalk Improvements, Project #4612122015 Community Development Block Grant Curb Ramp and Sidewalk Installations20th Avenue at La Salle Drive Strom Drain Extension22nd Avenue - Drainage24th Avenue, Isabelle Avenue Storm Line24th Avenue, Isabelle Avenue, 26th Avenue and Alameda De Las Pulgas Drainage System27th Avenue at El Camino Real Proposed Storm Drain291 41st Avenue Proposed Subdrain30th Avenue and Isabelle Avenue Storm Drain ModificationsAcetate Drawing of Proposed Turner "Mushroom" Design for 3rd Ave & H St. BridgeAddition Fencing along 19th Ave. ChannelBarneson Avenue Sidewalk ConstructionBermuda Bridge Utility Relocation Project - BKFCaltrain Overcrossing Bridge at Poplar AvenueCommunity Development Block Grant (CDBG) Wheelchair Ramp and Sidewalk Installations (Project Number: 09-90-12.12)Crystal Springs Road - Proposed SidewalkCrystal Springs Sidewalk ExtensionEast 3rd Avenue Sidewalk and Streetscape Improvements, Project No. 460745East Bayshore Boulevard Bike PathEast Hillsdale Boulevard - Widening Part II Marina Lagoon BridgeEast Hillsdale Boulevard Bridge - Seismic RetrofitEast Third Avenue Widening and Seal Slough Bridge Foundation Plan No. 2El Camino Real at Seville WayEl Camino Real Bridge Widening between 2nd Avenue and Crystal Springs RoadFernwood Street Bridge Structure - Storm Culvert For Laurel CreekHighway 101Hillsdale Boulevard Bridge - Norfolk Street to Foster City LimitsHWY 92 and HWY 101 Separeation of Left BridgeHWY 92 and HWY 101 Separeation of Right BridgeJ Hart Clinton Drive Bridge ImprovmentsJ. Hart Clinton Widening at Seat Slough BridgeKingridge Phase 1 - Record DrawingsMarina Lagoon Branch Bridges Replacement at Mariner's Island Boulevard, Project No. 09-90-14.31Mariner's Island Boulevard Bridge Conform ReconstructionNorfolk Street at San Mateo Creek BridgeNotice of Proposed Local & Public Improvement - Leslie Street - Railroad StreetProposed Bridge at Fremont Street Over San Mateo CreekProposed Bridge at Humboldt Street and 3rd Avenue Over San Mateo CreekProposed Bridge Over San Mateo Creek at San Mateo DriveRailroad Avenue Profile from Tilton Avenue to 300 Feet NorthRetail Center - 1960 South El Camino Real at 20th AvenueSan Mateo to Hayward Bridge RoadSewer Improvements -Tilton AvenueSPRR Crossing at Various LocationsTilton Avenue Bridge ReplacementUntitled (17)West 20th Avenue Sidewalk Construction