Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
"C" Basin Sanitary Sewer Rehabilitation Phase 1 496613-46000-9136
1000 Franklin Parkway - Kaiser Permanente
102 and 106 South Idaho Street - Plaza De Oro
1150 19th Avenue - Bay Area Self Storage
16th Avenue Channel - Waste Water Treatment Plant and Bayside Elementary School
17th Avenue Traffic Signal Modification
1984 - 1985 Sanitary Sewer Repair
1985 / 1986 Sanitary Sewer Repair - Community Development Block Grant (CDBG)
1992 - 1993 Sanitary Sewer and Storm Drain Improvements - Phase I
1993-1994 Community Development Block Grant Repair and Reconstruction of Norfolk Street, 2nd Avenue and 3rd Avenue, Project No. 90-1212, 90-8912
1993-1994 Community Development Block Grant Repair and Reconstruction of Norfolk Street, Second Avenue and Third Avenue
1994 -1995 Quebec Street - Base Failure repair and Street Improvements Phase I, Project No. 90-89.12
1995 1996 Citywide Storm Drain Improvements; Project Number: 09-90-61.44
1995 Sanitary Sewer Repair / Rehabilitation Project, #09-90-77.81-44
1995 Sanitary Sewer Repair and Rehabilitation, #09-90-77.81-42
1995 Sanitary Sewer Repair Rehabilitation Project; Project Number: 09-90-77.81-41
1995 Shoreview Areas Sanitary Sewer Repair/Rehabilitation, Project No. 09-90-77.81-45
1995-1996 Citywide Storm Drain Improvements Phase II, Project Number: 09-90-61.44
1996-1997 Base Failure Repair & Street Resurfacing Phase II, Project Number: 09-90-89-12.03
1998-1999 Citywide Storm Drain Improvements Phase 4; Project Number: 09-90-61.44-16
1998-1999 Citywide Storm Drain Improvements Phase III-A, Project No. 90-90-61.44-18
1999-2000 Citywide Storm Drain & Street Improvements; Project Number: 09-90-61.44-17
1999-2000 Sanitary Sewer Repair & Rehabilitation; Project Number: 09-77.81-65
19th Avenue at Delaware Street Signal Interconnect and Concar Drive at Delaware Street Traffic Signal Modifications, Project No. 09-90-55.34
19th Avenue Bridge Rail
1st Avenue and B street Storm Drain Improvement, Project No. 90-61.44-02
1st Avenue at Ellsworth Avenue Street and Signing, Striping Improvement Plan
2000-2001 Sanitary Sewer Repair and Rehabilitation - Phase I, Project No. 09-90-77.81-70
2000-2001 Sewer Collection System Improvements, #09-90-78.33-01
2001 2002 Citywide Street Slurry Seal - Phase I (Project Number: 09-90-82.12-24)
2002 2003 Sanitary Sewer Repair and Rehabilitation - Phase I (Project Number: 09-90-77.81-76)
2002-2003 Base Failure Repair and Street Resurfacing - Phase II
2003 City Wide Street Rubberized Chip Seal, Project No. 460004
2003 City Wide Street Slurry Seal
2003 Citywide Street Base Failure Repair (Project Number: 09-90-89.12-32)
2007 Street Resurfacing, Project No. 467004-46000-7020
2007 Street Resurfacing, Project NO. 467020
2008 Downtown Street Resurfacing And Strom Drain Improvements, Project #467004-46000-7030
2009 Street Resurfacing - Phase I, Project No. 467004-46000-7035
2011 Citywide Sewer Cleaning & Inspection Large Diameter Pipes
2011 Slurry Seal Project, Project NO. 467004-4600-7046
2011 Street Resurfacing - Phase II, Project No. 467004-46000-7048
2011 Street Resurfacing Phase II Project NO. 467004-46000-7048
2012 Citywide Base Failure Repair, Project No. 467004-46000-7049
2012 Sanitary Sewer Repairs- Various Locations Project No: 469913-460009134
2012 Slurry Seal Project, Project No. 467004-46000-7052
2012 Street Resurfacing Phase II Project NO. 467004-46000-7051
2013 Slurry Seal Project Project NO. 467055
2016-18 Street Rehabilitation Phase II
2017-18 Sanitary Sewer Cleaning and Video Inspection Basin A
2018-19 Community Development Block Grant Street Rehabilitation Project
2018-2019 Street Rehabilitation Phase I
2018-2019 Street Rehabilitation Phase II
2021 Basin E Sanitary Sewer Cleaning and Inspection Video
2070 Delaware - Drainage and Grading Plan
22nd Avenue and Isabelle Avenue Drainage Ditch Enclosure
22nd Avenue, Flores Street to Hacienda Street
24th Avenue Sanitary Sewer Relief Line Project
25th Avenue Sanitary Sewer Relief Line Project
28th Avenue Bicycle Boulevard
2901-2905 South El Camino Real - Peninsula Station
2nd Avenue and El Camino Real Parking Garage Improvements
2nd Avenue at El Camino Real Improvements
2nd Avenue, 36th Avenue & Occidental Avenue Street Reconstruction
3150 Clearview Way Improvement Plans
31st Ave Sanitary Sewer Rehabilitation, Project NO. 469913-46000-9126
31st Avenue and Harvard Road Sanitary Sewer Improvements, Project No. 90-7781-31
377 2nd Avenue - Main Street Parking Structure
3rd Avenue - Sewer Repairs and Storm Drain Installation, Project NO. 09-09-77.81-47
3rd Avenue / US 101 Interchange Improvements And Humboldt Street Bridge Replacement
3rd Avenue and Ellsworth Street Sewer Upgrade
3rd Avenue and Norfolk Street Traffic Signal
3rd Avenue From Detroit Drive to Foster City Boulevard Force Main
3rd Avenue Overcrossing At HWY 101
400 East 4th Avenue Site Improvements
41st Avenue Sewage Pump Station
42nd Ave Pump Station Rehabilitation Project
4th and Fremont Green Infrastructure Project
4th Avenue and Humboldt Road Sound Wall
4th Avenue Lighted Crosswalk Warning System; Project Number: 09-90-89.12-19
55 West 3rd Avenue - San Mateo Public Library
5th Avenue Widening At El Camino Real
60 Hillsdale Mall - Hillsdale Mall
800 B Street - Nazareth Plaza - Residential and Commerical Building
85/86 Sanitary Sewer Repair - Phase III
86/87 CDBG Sewer Repair, Project No. 95-1303
86/87 Sewer Repair 86/87 - Phase IV, Project No. 90-7781-04
Alanhill Lane Improvement Plan
Alley Reconstruction Between College Avenue and Poplar Avenue
Alley, College Avenue to State Street Improvement Plans
Arch Culvert Extension - San Mateo Creek and Rail Corridor
B Street Sanitary Sewer Reconstruction
Baldwin Avenue and Ellsworth Avenue From Baldwin Avenue to Poplar Avenue Sanitary Sewers Improvement
Barneson Avenue and Alameda De Las Pulgas Intersection Improvements, Project No. 466603
Base Failure Repair and Street Resurfacing Phase II 2001-2002, Project No. 09-90-89.12-29
Basin 1A Collection System Improvements
Basin 1B Collection System Improvements
Basin 2 and 3 Collection System Improvements Lift Stations Package
Basins 2 and 3 Collection System Improvements Pacific Blvd Force Main
Bay Landing - 1 to 21 Bay Landing
Bay Meadows (Phase 1-2) GPS As-Bulit
Bay Meadows Barn 1 Corpoation Yard Plan
Bay Meadows Development
Bay Meadows Development - Saratoga Drive
Bay Meadows Development (3)
Bay Meadows Development Delaware Street
Bay Meadows Development Franklin Parkway and Saratoga Drive connection to East Hillsdale Boulevard
Bay Meadows Development Landscape Entry Walls
Bay Meadows Development Offsite Sanitary Sewer Connection to Mongini Pump Station
Bay Meadows Development Phase II
Bay Meadows Development Phase II (4)
Bay Meadows Development Phase II Norfolk Street Sewer Connection (NSSC) Project
Bay Meadows Development Sartoga Drive - Station 64+00 to 70+00
Bay Meadows Development Tunnel Construction
Bay Meadows Development Tunnel Construction Plan
Bay Meadows Infield Barn Plan
Bay Meadows Phase 3 GPS
Bay Meadows Pump Station GPS As Built
Bayside Elementary Schol Swimming Pool Site
Baywood Elementary School New Classroom and LGI Building-600 Alameda de Las Pulgas
Beresford Park Parking Lot Rehabilitation; Project Number: 09-90-06.31
Beresford Recreation Center Remodel Construction Project - 2720 Alameda De Las Pulgas
Beresford Street - Drainage Improvements
Borders Bookstore - 2925 South El Camino Real
Branson Drive Sanitary Sewer Project, Project No. 7781-39
Bridgepoint Commercial Site Improvements - 2207 Bridgepointe Parkway
Bridgepointe Grading and Utility
Bridgepointe Parkway at Bridgepointe Circle at Chess Drive Traffic Signal Installation
Bridgepointe Public Street Improvements
Bridgepointe Retail Center - 2205 Bridgepointe Parkway
C.D.B.G Sewer Repair 88-89
Caltrain Station Platforms Improvements
Caltrans East Hillsdale Boulevard Overcrossing Roll 1 of 2
Caltrans Signal Lighting, Ramp Metering, Lighting and Sign Illumination, Pavement Delineation
Casanova Pump Station Replacement Project, #467831
Central Fire Station Propsed Parking Lot and Drainage
Central Park South Apartments
Central Parking Improvement District Lot No.9 - 28 North B Street, Project No. 90-4454
City Hall Expansion and Remodel - 330 West 20th Avenue
City Hall Modifications Americans with Disabilities Act Compliance - 330 West 20th Avenue
City of San Mateo Demolition of Existing Main Street Parking Facility - 323 South Ellsworth Avenue, Project No. 09-90-0823.05
City of San Mateo Main Street Parking Structure, Project No. 09-90-0823.10
City of San Mateo Viewridge Drive Strom Drain Improvements, Project No. CSMT.03.03-001
City Wide Street Cape Seal; Project No. 467005100
Citywide Base Failure Repair 467004-46000-7049
Citywide Slurry Seal Package 1-A
Citywide Slurry Seal Package 1-A (2)
Citywide Street Rehab Package 1B
Citywide Street Rehabilitation Package 1-C (Phase 2) Project
Citywide Street Rehabilitation Package 3-B (Phase 1)
Claremont Street Storm Drain
Clear View Way & Hillsdale Boulevard Roadway Fill
Concar Drive, Grant Street, Deleware Street Improvment Plans
Construction of 4" Waterline on 20th Avenue
Coyote Point Recreation Area Eastern Promenade Rejuvenation Project
Crystal Springs Road, Tulane Road to El Cerrito Avenue
Cuesta Avenue at Ensenada Way Improvements
Dale Avenue Force Main Repair
Dale Avenue Pumping Station Comminutors Replacement - 1025 Patricia Avenue
Dale Avenue Pumping Station Sluice Gate - 1025 Patricia Avenue
Dale Avenue Pumpstation Influent Line - Manhole Replacement
Dartmouth Road From 3rd Avenue to 5th Avenue Storm Drain Improvements
De Anza Boulevard Fire Station Signal, Project No. 09-90-55.32
De Anza Boulevard Widening - Polhemus Road to Parrott Drive
Delaware Street Improvement - Bermuda Drive to bay Meadows Race Track, Project #465146
Delaware, 19th Avenue to Bermuda Drive Traffic Signal Modification, Project No. 09-90-5233
Delware Street at Concar Drive Traffic Signal Modification
Dolores Street Storm Drain Improvement
Downtown San Mateo Creek Bridge Earthquake Retrofit and Rehabilitation Project, Project No. 09-90-17.47
Downtown Traffic Signal Coordination, Project No. 90-7913
Downtown Twinkle Light Installation Project
Draegers Market Improvements - 222 East 4th Avenue
Dragers Market - 222 East 4th Ave
Drainage Channel for San Mateo Village Units #3 & #5
East 3rd Avenue 54-inch Wastewater Outfall Line Relocation
East 3rd Avenue Landfill Closure Phase II Seal Point Park, Project No. 460531
East 3rd Avenue Landfill Closure Phase II Seal Point Park, Project No. 460531 (3)
East 3rd Avenue Landfill Shoreline Protection Project
East 3rd Avenue Landscape Improvements From Norfolk Street To Mariner's Island Boulevard
East Hillsdale Boulevard Bridge - Seismic Retrofit Project, Project #09-90-17.36
East Hillsdale Boulevard Interchange At Highway 101
East Hillsdale Boulevard Overcrossing Project
East Poplar Ave Street Reconstruction
East Third & Fourth Avenue Traffic Signal Interconnect Project, Project No. 09-90-51.37
East Third Avenue Landfill Closure Phase II/Seal Point Park
El Camino Real
El Camino Real - 17th Avenue and Bovet Road
El Camino Real - 17th Avenue Traffic Signal
El Camino Real - Saint Matthews to 2nd Avenue
El Camino Real and 25th Avenue Street Light Project, Project 09-90-87-84
El Camino Real and 28th Avenue From 28th Avenue and Edison Street to Delaware Street and Railroad Right of Way Storm Drain System Stage I
El Camino Real and 31st Avenue - Traffic Signal System
El Camino Real and Hillsdale Boulevard
El Camino Real and West Bellevue Avenue Signal
El Camino Real at 20th Avenue Improvements
El Camino Real At 41st Avenue Traffic Signal
El Camino Real from Hilltop Road to Santa Inez Avenue Improvement Plans
El Camino Real from Poplar Avenue to 31st Avenue
El Camino Real from Poplar Avenue to 31st Avenue (3)
El Camino Real from Poplar Avenue to 31st Avenue (5)
El Camino Real Sanitary Sewer Improvements
El Camino Real Sanitary Sewer Rehabilitation
El Camino Real Stationing
El Camino Real Street Improvement
El Camino Real Street Improvements
El Camino Real Traffic Controller Details
El Camino Real Traffic Signal Undergrounding
El Camino Real Underground Project: 09-90-59.10
El Portal Avenue Stormwater Improvements, Project No. 468004-46000-8007
Elm Street From Poplar Avenue to Monte Diablo Avenue and Poplar Avenue at Ellsworth Avenue Reconstruction - Phase I, Project No. 09-90-89.12-08
Elm Street Reconstruction Street Resurfacing Phase II, Project No. 09-90-89.12-08
Fashion Island Boulevard - Installation of Signals and Interconnect System, Project No. 90-7914
Fashion Island Boulevard at Marina Lagoon Bridge Design
Fashion Island Boulevard at Norfolk Street Traffic Signal Modification; Project No. 90-90-58.38
Fashion Island Boulevard Bike Path Striping Plan
Fashion Island Boulevard Bridge at Marina Lagoon
Fashion Island Boulevard Bridge Earthquake Repair
Fiesta Drive Bay Meadows Development Wall Construction - Fiesta Drive
Fire Station 25
Foster City Water Line Plans
Fourth Avenue Landscaping, El Camino Real to B Street, #90-75.23
Fremont Street Reconstruction, #09-90-89.12-11
Fremont Street Storm Drain
Gateway Entry Intersection Features - 3rd Avenue & South Humboldt Street
Glendora/Shasta Relief Sewer
Grading Drainage and Pavement Plan
Grant Place Sunnybrae School Site Sanitary Sewer Improvements - 1031 S Delaware Street, Project No. 92-7781
Grant Street Storm Drain
Greenwood Avenue Sewer Replacement Project
Handicap Ramps - Hillsdale & El Camino Real
Highway 101 - 16th Avenue to South
Highway 101 - Fence and Guard Rail Details
Highway 101 - Right of Way & Construction Details
Highway 101 - Soundwall Plans
Highway 101 & 92 - Construction Plans For Parking Lot Off 19th Avenue
Highway 101 & 92 - Construction Plans For Parking Lot Off 19th Avenue (3)
Highway 101 & 92 - Construction Plans Of Parking Lot off 19th Avenue
Highway 101 At Hillsdale Boulevard
Highway 101 Project Plans
Highway 101 Project Plans (5)
Highway 101 Project Plans (6)
Highway 101 Project Plans (7)
Highway 101 Soundwall - Construction Plans
Highway 92 - Construction Details
Highway 92 - Construction Plans
Highway 92 - Construction Plans (11)
Highway 92 - Construction Plans (14)
Highway 92 - Construction Plans (15)
Highway 92 - Construction Plans (16)
Highway 92 - East On-Ramp at Ralston Avenue
Highway 92 - Electrical details
Highway 92 - Profiles and Grade
Highway 92 and West Hillsdale Boulevard Ramps
Highway 92 and West Hillsdale Boulevard Ramps (3)
Highway 92 At Polhemus Road
Highway 92 De Anza On-Ramp to West Hillsdale Off-Ramp
Highway 92 On/Off Ramps At Concar Drive
Highway 92 Plans and Construction
Highway 92 Plans and Construction (18)
Highway 92 Plans and Construction (19)
Highway 92 Plans and Construction (20)
Highway 92 Plans and Construction (21)
Highway 92 Plans and Construction (22)
Highway 92 Plans and Construction (23)
Highway 92 Plans and Construction (24)
Highway 92 Plans and Construction (25)
Highway 92 Plans and Construction (26)
Highway 92 Plans and Construction (27)
Highway 92 Plans and Construction (28)
Highway 92 Plans and Construction (29)
Highway 92 Plans and Construction (30)
Highway 92 Plans and Construction (31)
Highway 92 Plans and Construction (32)
Highway 92 Plans and Construction (33)
Highway Lighting
Hillsdale Boulevard at El Camino Real Grade Separation
Hillsdale Boulevard - Grade Seperation
Hillsdale Boulevard and El Camino Real Traffic Signal
Hillsdale Boulevard at Curtiss Street Improvement 1998-1999 Phase II , Project No. 90-89-61.44
Hillsdale Boulevard at HWY 92 Ramp Modifications
Hillsdale Boulevard Grade Separation at El Camino Real & Pacific Boulevard
Hillsdale Boulevard Overcrossing
Hillsdale Boulevard Overcrossing (7)
Hillsdale Boulevard Overcrossing (8)
Hillsdale Boulevard Overcrossing (9)
Hillsdale Boulevard Overcrossing / Hillsdale Pump Station
Hillsdale Boulevard Overcrossing,
Hillsdale Boulevard Traffic Signal Improvements and Interconnect, Project No. 09-90-55.37
Hillsdale Boulevard Undercrossing / Grade Seperation at El Camino Real and Pacific Boulevard
Hillsdale Boulevard Undercrossing at El Camino Real and Pacific Boulevard
Hillsdale Boulevard Undercrossing at El Camino Real and Pacific Boulevard (4)
Hillsdale NB Reconfiguration Art Installation
Hillsdale North Block Reconfiguration
Homestead Village - 1830 Gateway Drive
Humboldt Street and Poplar Avenue Signal Installation
Humboldt Street From Poplar Avenue to 1050 Ft. North Strom Drain
Humboldt Street From Poplar Avenue to Peninsular Avenue Street Improvement
Huron Avenue, Kingston Street to Huron Court Drainage Improvements, Project No. 09-8915
Idaho & Sunnybrae - PG&E Gas Cathodic Protection System
Idaho Street - Trunk Sewer Rehabilitation, Project No. 90-7781-48
Idaho Street Trunk Sewer to Dale Avenue Pump Station
Improvement Plans - Mariners Island Bridges 1 & 2
Improvement Plans for San Mateo Meadows
Intersection of South Delaware & Concar Drive
Irrigation Operation & Maintenance Manuals
J Hart Clinton San Mateo Creek Bridge Widening
Joanne Street Reconstruction and Aragon Boulevard Resurfacing, #09-90-89.12-23
Kaiser San Mateo-1000 Franklin Parkway
King Park Irrigation System
Kingridge Sanitary Sewer Line Improvements - Phase III
Kingridge Sanitary Sewer Line Improvements - Phase III (2)
Kingridge Sewer Line Rehabilitation
Kingridge Sewer Line Rehabilitation Emergency Slope Stabilization - Phase I
Kingridge Sewer Line Rehabilitation Emergency Slope Stabilization - Phase I, Project #469922-46007
Kingridge Sewer Line Rehabilitation Emergency Slope Stabilization - Phase I, Project #469922-46007 (3)
La Selva Bike Path Bridge
Laurel Creek Dam Project
Laurel Heights General Plan of Street Improvements
Laurie Meadows and Woodbridge Lift Station Project
Laurie Meadows Grade Separation - 42nd Avenue
Laurie Meadows Grade Separation - 42nd Avenue & El Camino Real
Laurie Meadows Grade Separation of the Southern Pacific Transportation Company Railroad Plan
Lighted Crosswalk Warning Systems
Lorraine Avenue, Ottawa Street and York Avenue Community Development Block Grant Repair and Reconstruction 1996-1997, Project No. 09-90-12.12
Lorraine Avenue, York Avenue, Ottawa Street, Prague Street, Quebec Avenue, Rochester Street Storm Drain Improvements Phase I 1996-1997, Project No. 09-90-61.44
Los Prados High Voltage Streetlight Conversion Project
Los Prados Sanitary Sewer Relief Project
Main Street - Streetscape Project Transportation for Livable Communities
Main Street Parking Facility, Project No. CPID 73-2
Main Street Parking Structure
Marina Court Apartments - 1633 Marina Court
Marina Lagoon - North Structure Improvements, Project NO. 09-90-68.91
Marina Plaza Shopping Center - 2900 South Norfolk Street
Mariner's Island Boulevard #2 and Dale Aveune - Sanitary Pump Station Improvement
Mariner's Island Boulevard and Trader Lane, Armada Way, Baker Way, West Cape Drive
Mariner's Island Boulevard Bridge and Highway 92 Improvements
Mariners Island Boulevard Marina Lagoon Branch Bridge Replacement, Project No. 09-90-14.31
Mariners Island Sewage Pumping Stations and Force Main, Project No. 64-9A
Martin Luther King Jr. Daycare Center - 725 Monte Diablo Center
Martin Luther King Park Phase1
MCI Fiber Optic Telephone Interconnect on 25th Avenue, Project No. 06719
Mclellan Avenue - Sanitary Sewer Force Main Improvement, Project No. 77.81.33
Mongini Pump Station Improvements, Project Number: 09-90-94.50-05
Mongini Sewage Pump Station Improvements, Project No. 09-90-94.50-05 - 2001 Pacific Boulevard
Monte Diablo Avenue Street Improvements 1998-1999
Monte Diablo Street Community Development Block Grant 1998-1999 and Storm Drain Improvements
Municipal Court Building at Humboldt Street and State Street
Municipal Golf Course Reservoir
Municipal Golf Course Reservoir Improvement Plan
Natural Gas Line Replacement and Improvements
Natural Gas Line Replacement and Improvements (2)
Norfolk Street at Marina Court Traffic Signal Installation, Project No. 09-90-08.66-25
Norfolk Street Bridge Replacement at San Mateo Creek, Project No. 09-90-11.31
Norfolk Street Rehabilitation Streetscape; Project Number: 09-90-38.31
Norfolk Street Rehabilitation/Streetscape, Project No. 09-90-38.31
North Delaware Street, 1st to Peninsula Avenue, El Dorado, Santa Inez, Monte Diablo Street Resurfacing, Project No. 09-90-31.32
O'farrell Street Cul De Sac Street Lighting Improvement
O'Neill Slough - Culvert Repair
O'Neill Slough Tide Gate Reconstruction, Project No. 466237
Pacific Boulevard, Delaware Street, Bernuda Drive, Texas Way, Dublin Way, Ginnever Street, 19th Avenue, Potomac Way, Trinity Street, Sullivan Street, Rossi Way and Fiesta Court Street Light Improvemen
Palm Avenue Storm Drain Improvements
Palm Garden Site Improvments - 76-96 17th Street
Park Bayshore Townhomes - 801 South Bayshore Boulvard
Parkside 30" Storm Pipe Emergency Repair
Parkside Plaza Sanitary Sewer Rehabilitation
Parkside Way at Alamed De Las Pulgas Improvements, Project No. 90-3232
Pasadena Drive, 39th Avenue to Santa Clara Way Drainage Improvements
Patricia Avenue - Gutter Grades
Peninsula Avenue Overcrossing
Peninsula Route From San Francisco to Santa Clara
Police Station - 200 Franklin Parkway
Poplar Avenue Storm Water Pump Station
Railroad Avenue Lighting Project; Project Number: 09-90-44.33
Railroad Avenue Sewer Upgrade
Railroad Avenue Union Pacific Parking Lot, Project No. 97.010
Rand Street Reconstruction
RCN Telecom Services City of San Mateo
Reclaimed Water - Near Bayfront Dike
Roadway Improvement Plan Georgetown Ave
Roadway Improvement Plan Georgetown Ave (5)
Roche Residence
Rochester Street and Ottawa Street Reconstruction
Rochester Street and Ottawa Street Reconstruction (13)
Rochester Street and Ottawa Street Reconstruction (24)
Saint Matthews Place - 111 Saint Mathews Avenue
San Mateo Basin D Sanitary Sewer Rehabilitation Project
San Mateo Buddhist Church - 2 Claremont Street Retaining Wal
San Mateo Citywide Storm Drain Improvements Phase I located at Santa Clara Way at Saratoga Drive and Notre Dame Avenue at Maple Street and South Delaware Street between Bermuda Drive at Saratoga Drive
San Mateo County Fairgrounds Water Main, Irrigation, Waste Lines and Electrical - 2495 South Delaware Street
San Mateo County Smart Corridors North Segment
San Mateo County Smart Corridors South Segment
San Mateo Creek Bridge Earthquake Retrofit Project, Project No. 09-90-17.46
San Mateo Creek Flood Control Improvements; Project Number: 09-90-61.44
San Mateo Creek North Levee Wall Segment A
San Mateo Delaware Street Storm Drain Project
San Mateo Downtown Caltrain Station Parking Lot
San Mateo Drive and Tilton Avenue Signal Improvements
San Mateo Drive From Grand Boulevard to Peninsula Avenue Storm Drain
San Mateo Executive Park-3055, 3125, 3155 Clearview Way
San Mateo Fire Station 24
San Mateo Gardens Addition - East 41st Place and Alley Way
San Mateo Glendale Village Traffic Calming, Project No. 09-90-59.30
Sanitary Sewer Full - Line Rehabilitation (Pipe Bursting) Project, Project NO. 09-90-77.81-75
Sanitary Sewer Repair & Bypass - Cresent Avenue & Clark Drive
Sanitary Sewer Repair and Rehabilitation Phase II for Shoreview Area 2000-2001, Project No. 09-90-77.81-70
Sanitary Sewer Repair and Rehabilitation Project 2002-2003, Project No. 09-90-77.81-77
Sanitary Sewer Repair and Rehabilitation Project Phase I 2000-2002, Project No. 09-90-77.81-72
Sanitary Sewer Repair Phase II 1985/1986
Sanitary Sewer Video Inspection Projects, Project No. 90-7781
Sewage Basin C - Sewer Repair Project
Sewer Collection System Improvements, #09-90-78.33-01
Sewer Repair 1986/1987 Phase V
Sewer Repair 1987/1988 Phase 3
Sewer Repair Project Phase 1, Project NO. 90-7781-35
Shoreview Avenue Strom Drain Improvements
South Bound Right turn Lane From Hillsdale Boulevard
Stanley Rd Drainage Improvements
State Highway 101
State of California Business And Transportation Agency Standard Plans List
State Of California Park & Ride Lot, 19th Avenue & HWY 101
Storm / Sanitary Sewer Repair and Rehabilitation Project Various Locations Phase I 1998, Project No. 09-90-77.81-60
Storm Drain Field Inspection Results
Sunrise Assisted Living of San Mateo Grading and Drainage - 955 South El Camino Real
The Crossroads - 1875 South Grant Street
The Hillsdale Boulevard Overcrossing / Pump Station at El Camino Real
The Metropolitan - 338 South Fremont Street
The Versailles - 10 Crystal Springs Road
The Versailles - 10 Crystal Springs Road (3)
Third Avenue Bridge Widening at Highway 101
Tilton Avenue Storm Drain Improvement, Project No. 90-89.12-06
Traffic Signal Installation 3rd Avenue And Dartmouth Road
Traffic Signal Modification - 4th Avenue At Delaware Street
Untitled (3)
Untitled (4)
Untitled (5)
US 101 Managed Lanes Sanitary Sewer Plan
US 101 Managed Lanes Sanitary Sewer Plan Additional Sheet
Wastewater Outfall Line Plan & Profile
Wastewater Outfall Line Plan & Profile (3)
Wastewater Treatment Plant Centrifuge Hoist Project
Wastewater Treatment Plant Motor Control Center Replacement Project
Waters Office Park Landscaping & Building Exterior Improvments -1470 Waters Park Drive
West Hillsdale Boulevard Traffic Signal Improvements and Interconnect, Project No. 09-90-55.36
Williams Communications Group Network Services - Delware Street, 25th Avenue
Winway Sanitary Sewer Overflow Connection
WWTP Gravity Thickener 1 and 2 Rehabilitation Project
WWTP Scum Concentrator Installation Project