Loading...
HomeSearchMy Public PortalAbout15316 CSO Volume Reduction Green Infrastructure – Steelcote Brewery (13381)15321 South County Sanitary Relief (P-419 to Cripple Creek Dr) (12205)15330 CSO Volume Reduction Green Infrastructure – Central Baptist Church (13155)15331 CSO Volume Reduction Green Infrastructure – 30 Brentmoor Park (13379)15332 CSO Volume Reduction Green Infrastructure – Mercedes Benz of St. Louis (13448)15333 CSO Volume Reduction Green Infrastructure – The Network Building (13391)15334 82nd Street to I-170 Sanitary Relief (UR-08, UR-09) (11993)15335 Bissell Point WWTF Main Substation Switchgear and MCC Replacement (12494)15336 Gaslight Square Sewer Improvements (11137)15337 Tilles Park, Litzsinger and Parkridge II Reduction (Litzsinger Rd and S McKnight Rd) (12230)15338 Scott Ave #1213 Storm Sewer (11424)15339 Stormwater Quality Green Infrastructure ΓÇô Small Grant Rainscaping Program (13352)15340 Harlem Baden Relief Phase IV (Herbert)(Hamilton to Darver Trunk) 1179615341 Construction Management Services ΓÇô Lower Meramec and Deer Creek Tunnels (11826)15342 Construction Management Services ΓÇô Tank Treatment Pump Station Facilities (11151)15343 General Services Agreement – Sewer and Channel Design (2019) (12398)15344 Radar Rainfall Data (2020) (12006)15345 Maintenance Yard Vehicle Storage Building (Mintert) (10282)15346 Forder Sanitary Interconnection (Forder Rd to Ringer Rd) (12180)15347 Baden and Mill Creek ORS Pump Stations – Pump Rehabilitation (13219)15348 CSO Volume Reduction Green Infrastructure – Iron Workers Union Hall (13393)15349 Kingsland Sanitary Storage Facility (Engelholm) (12841)15350 Wastewater System Refunding Revenue Bonds 2019 Ordinance15351 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13041)15352 Dammert and Broadway Sanitary Relief (SKME-551) Part 2 (11155)15353 Bissell – Coldwater – Missouri – Meramec Public II Reduction (2020) Contract A (12033)15354 Brentwood Forest, Fair Oaks, Middlesex II Reduction (I-64 and Lay Rd) (12100)15355 Conway Village Sanitary Relief (Conway Rd to I-64) (12131)15356 Harlem – Baden Detention Basin Bioretention CSO VR GI (12916)15357 CSO Volume Reduction Green Infrastructure – Morning Star Missionary Baptist Church Parking15358 CSO Volume Reduction Green – Red Sea Eritrean Community Center (13451)15359 Edna – Thursby, Essex, Treasure Cove, Wayfarer East and Yarnell Creek West II Reduction15360 Beldon Drive Storm Sewer (11501)15361 Midridge Drive Storm Sewer (11520)15362 Nottingham – Mayfair Storm Sewer (11389)15363 Woodlake Village 1009 Bank Stabilization (11046)15364 Sappington Rd. and Sapphire Ridge Ct. Storm Sewer (11573)15365 Deer Creek Sanitary Tunnel (Clayton Rd to RDP) - 1173115366 General Services Agreement – Construction Management (2019) (12386)15367 Emergency Repair #063 (Caulks FM at 2143 Creve Coeur Mill Rd) (13495)15368 Glenn Drive No 128 Storm Sewer (11426)15369 Bellefontaine No 2 Sanitary Relief (Chambers Rd to Coburg Lands Dr) (12092)15370 CSO Volume Reduction Green Infrastructure – Gateway Science Academy (13449)15371 Grand Glaize WWTF Floodwall Protection (13072)15372 Park Drive Sanitary Relief (Engelholm Avenue) (12163)15373 Bartolet to Paule Ave. Storm Sewer Replacement (11494)15374 Lower Meramec River System Improvements-Baumgartner to Fenton WWTF Tunnel (11746)15375 Riverport 6 Pump Station (P-781) (12188)15376 West Lockwood Sanitary Relief (11679)15377 Brentwood Bound Agreement (Various MSD Projects) 03032020 ver15378 Missouri Highways and Transportation Commission Agreement (Manchester Avenue) 03032020 Ver15380 CCTV Inspection and Physical Inspection of Sewers (2020) (12000)15381 Bond Election 202015386 Mississippi Floodwall ORS Pump Stations Rehabilitation Phase II (12484)15387 Riverside and Yarnell Sanitary Relief Replacement (12840)15388 Kenwood – June Creek Bank Stabilization (11476)15389 Brunston Dr. 4875 Bank Stabilization (11623)15390 Stanwood Dr. and Belwood Dr. Storm Sewer and Bank Stabilization (11442)15391 Salary of Executive Director.Ordinance 2020 (2)15392 Baden Cityshed Mitigation Basins (Calvary, Frederick, Partridge and Tillie) (13232)15393 Brookshire Sanitary Relief (Brookshire Dr to Cougar Dr) (12104)15394 Capilia Sanitary Relief (Grand Rd to Capilia Dr) (12111)15395 Carson Villa, Rosary Lane and Thurston II Reduction (12112)15396 Vance Rd Pump Station (P-472) Upgrades (12490)15397 Whitney Pointe Dr No. 2210 Channel Improvements (11618)15398 Keat Properties Agreement (Various MSD Projects)15399 Construction Management Services – Lower and Middle RDP Tunnel Facilities (11152)15400 Deer Creek Sanitary Tunnel (Clayton Rd to RDP) – Pump Station (Design Supplemental) (12615)15401 Modified Classification Plan Ord 2020 - Clean15402 Modified Compensation Plan Ord 2020 - Clean15403 Property and Bolier & Machinery Coverage Ordinance15404 Excess Flood & Earth Movement Insurance Coverage Ordinance15405 National Flood Insurance Program (NFIP) Ordinance15406 Excess Workers' Compensation Insurance Coverage Ordinance15407 Fiduciary Liability Insurance Coverage Ordinance15408 Commercial Crime Insurance Coverage Ordinance15409 Underground Storage Tank Insurance Ordinance15410 Major Facility Pollution Liability Insurance Coverage Ordinance15411 Blocked Main and Overcharged Line Back-Up Insurance Program15412 Auto Liablity Insurance Program Ordinance15413 Contractors Equipment (Inland Marine) Insurance Program Ordinance15414 Owners Pollutions Protective Insurance Program Ordinance15415 Cyber Liability Insurance Program Ordinance15416 Combined Liability Insurance Program Ordinance15417 Public Official Excess Liability Insurance Ordinance15418 Wastewater Rate Ord 202015419 Tax Levy Ord 202015420 Budget Appropriations Ord FY2115422 Gravois Trunk (Whitecliff to RDP) Sanitary Relocation Phase VI (Buckley Rd to Union Rd)15423 CSO Volume Reduction Green Infrastructure – NBC Lounge (13378)15424 Kayser Ave. – Waller Ave. Storm Sewer (11545)15425 Infrastructure Repairs (Wastewater) (2021) (12987)15426 Louisiana and Holly Hills Storm Sewer (11522)15427 E. Watson Sanitary Relief (Rudson Ln to Richview) (12152)15428 Midland Sanitary Relief (Midland Blvd to Sims Ave (12352)15429 CSO – Mary Avenue South of Manchester CSO Interceptor (I-132) Outfall (L-106) Elimination IGA15430 Deer Creek Trunk Sewer Relocation (Breckenridge Industrial Ct to Mary Ave) (13480)15431 Water Quality Stormwater BMP Park Along Deer Creek (Hanley Rd to South Brentwood Blvd)15432 DC-02 & DC-03 Sanitary Relief (Brentwood Blvd to Conway Rd) Phase III and Phase IV (12472)15433 Deer Creek Sanitary Tunnel (Clayton Rd to RDP) – Pump Station (12615)15434 Harlem Baden Relief Phase IV (Hebert) – Trunk Sewer Rehabilitation (11800)15435 Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711)15436 Lindley Drive Sanitary Relief (I-170 to Ashmont Dr) (UR-07) (12329)15437 North Pointe Detention Basin Opti Retrofit (13386)15438 Stormwater Infrastructure Repairs (2021) (13004)15439 Cityshed Mitigation Program Design (Contract A) (12693)15440 Bissell – Coldwater – Missouri – Meramec Sanitary System Improvements (11144)15441 Amblewood Sanitary Relief (Waterford Dr to Birchbark Dr) (12077)15442 Banff Sanitary Relief (Caithness Rd to Lanark Rd) (12085)15443 Baxter – Meramec Bottoms – Valley Park Private II Reduction (12088)15444 Bissell – Coldwater – Missouri – Meramec Public II Reduction (2022) Contract A (12584)15445 Bissell – Coldwater – Missouri – Meramec Public II Reduction (2022) Contract B (13031)15446 Edmundson Sanitary Relief (Edmund Ave to Bataan Dr) (12159)15447 Florissant Dunn Sanitary Relief (St. Anthony Ln to I-270) (12178)15448 Friedens (Partial) II Reduction (Chain of Rocks Dr and Fontaine Pl) (12185)15449 Hathaway Drive Sanitary Relief (13432)15450 Lindsay – St. Albert Private II Reduction (12330)15451 Newport Landing Pump Station (P-480) Elimination (12357)15452 North Fee Fee Creek Public II Reduction (12433)15453 Upper Baden Sanitary Relief (Jennings Station Rd to Oakridge Blvd) (12241)15454 Lemay Sanitary System Improvements (11145)15455 GC-06 Gravois Creek to Briarstone and Gates Sanitary Relief Phase II (12157)15456 Glenfield Sanitary Relief (Watson Woods Ct to S Lindbergh Blvd) (12264)15457 Gravois Creek Sanitary Trunk Relocation and Stream Stabilization (Affton Athletic Complex to15458 Lemay Public II Reduction and Rehabilitation (2022) Contract A (12590)15459 S Brentwood Blvd Sanitary Relief (Daytona Dr to Walinca Terrace) (12195)15460 Lower & Middle RDP CSO Controls System Improvements (11109)15461 LMRDP CSO Storage Tunnel (Broadway to RDP Tubes) (11820)15462 Maline Creek CSO BP 051 052 Local Storage Facility (Chain of Rocks Dr to Church Dr) (11656)15463 RDP Tributaries & Upper RDP CSO Controls & Lower Meramec System Improvements (11153)15464 CSO – Mary Avenue South of Manchester CSO Interceptor (I-132) Outfall (L-l06) Elimination-Design15465 Hampton Creek Sanitary Relief (Deer Creek Trunk to Oxford Dr) Phase I (12334)15466 REJIS Intergovernmental Agreement Ordinance15467 Olive Washington – Grand to Vandeventer Combined Sewer Relief (12702)15468 82nd Street to I-170 Sanitary Relief (UR-08, UR-09) (11993)15469 CSO Volume Reduction Green Infrastructure (11146)15470 CSO Volume Reduction Green Infrastructure – River Des Peres (13078)15471 Easement Acquisition for Wastewater Projects (2021) (12818)15472 FF-07 Fee Fee Creek Sanitary Relief (Meadowside Dr to Willow Brook Dr) (10012)15473 Infrastructure Repairs (Facilities) (2021) (12995)15474 Lemay WWTF Aeration Basin Gates (13303)15475 White Birch Pump Station (P-725) Elimination (12583)15476 University City II Reduction – East (UR-08 and UR-09) Phase II (13344)15477 Gleason 656 Storm Sewer (11474)15478 Reynosa – Melitta Streambank Stabilization (11630)15479 Cherry Tree Lane Storm Improvement (10209)15480 Lang Royce Sanitary Relief (Fargo Dr to Floridale Ct) (12325)15481 Spring Ave Sanitary Relief (Yeatman Ave to Dale Ave) (12208)15482 Critical Infrastructure Assessment and Asset Investigation (2020) (12907)15483 Flow Metering and Monitoring (2017)(12759)15484 General Services Agreement – Facility & Sewer Design (2020) Contract A (12397).15485 Harlem Baden Relief System Improvement Design (Contract A) (12695)15486 Jefferson Barracks Tunnel (Lemay WWTP to Martigney PS) (11711)15487 Stream Flow Gauge Operation and Maintenance (USGS) (10766)15488 Stream Flow Water Quality Sampling (2020) (12004)15489 Power Systems Studies15490 Collection Litigation Services Gusdorf Ordinance15491 Collection Litigation Services Heimos Ordinance15492 Collection Litigation Services Kramer Ordinance15493 Modified Classification Plan Ord August 2020 - Clean15494 Modified Compensation Plan Ord August 2020 - Clean15495 - Revised - Subordinate Wastewater System Revenue Bonds Series 2020A15496 Lemay 1 Pump Station (P-301) Sluice Gate Replacement (13041)15497 CSO Volume Reduction Green Infrastructure – Preservation Square Phase I (13417)15498 CSO Volume Reduction Green Infrastructure – Good Shepherd Infant and Toddler Center15499 Lemay Public II Reduction (2021) Contract A (12059)15500 Valley Public II Reduction (Clarkson Rd and Kehrs Mill Rd) (12507)15501 West Lockwood Sanitary Relief (11679)15502 Drury – Switzer Storm Sewer (11418)15503 White and Rosale II Reduction Bridgeport Sewer Separation (11212)15504 Tulane-Wilbur Outfall Sanitary Relief Sewer (Weber Rd to Hildesheim Ave)(12239)15505 Bissell & Lemay WWTF Fluidized Bed Incinerators (12565)15506 General Services Agreement – Construction Management (2019) (12386)15507 Spirit 2 Forcemain Improvements (P-736 to P-750) (12628)15508 TM-01 Two Mile Creek Outfall Sanitary Relief (12231)15509 Upper Mattese Trunk Sanitary Relief (Theiss Rd to Liberty Trail Rd) (12249)15510 Wet Weather Optimization Study (13436)15511 General Services Agreement – Water Quality Support Services (2021) (12842)15512 2020 Tax Ordinance Levy w chart15513 Upper Maline Trunk Sanitary Relief Phase IV Section B (11791)15514 CSO – Mary Avenue South of Manchester CSO Interceptor (I-132) Outfall (L-106) Elimination (2)15515 CSO Volume Reduction Green Infrastructure – St. Henry Place (13497)15516 Deer Creek Sanitary Tunnel (Clayton Rd to RDP) (11731)15517 Gravois Trunk (Whitecliff to RDP) Sanitary Rehabilitation (Fannie Ave to Pardee Lane) (10496)15518 Infrastructure Repairs (Rehabilitation) (2021) Contract A (13014)15519 Lower Meramec River System Improvements – Baumgartner to Fenton WWTF Tunnel (11746)15520 Lower Meramec Tunnel II Source Reduction (13164)15521 Riverport 6 Pump Station (P-781) Rehabilitation (12188)15522 Spirit of St. Louis 2 Pump Station (P-736) Replacement (12207)15523 Weatherby Drive Storm Sewer (11396)15524 Wilborn Drive 5361 Storm Sewer (11430)15525 Geyer Sanitary Relief and Windsor Springs P-521 Storage (Big Bend Blvd to Windsor Springs Dr (12175)15526 General Services Agreement – Facility & Sewer Design (2020) Contract B (13059)15527 General Services Agreement – Geotechnical (2020) Contract A (12391)15528 General Services Agreement – Geotechnical (2020) Contract B (12392)15529 General Services Agreement – Geotechnical (2021) Contract C (12393)15530 General Services Agreement Landscape Design (2019) (13044)-dd15531 General Services Agreement – Property Appraisal (2021) Contract A (13087)15532 General Services Agreement – Property Appraisal (2021) Contract B (13088)15533 General Services Agreement – Property Appraisal (2021) Contract C (13089)15534 General Services Agreement – Property Appraisal (2021) Contract D (13090)15535 General Services Agreement – Sewer and Channel Design (2021) Contract A (12400)15536 General Services Agreement – Survey Services (2020) Contract A (12413)15537 General Services Agreement – Survey Services (2020) Contract B (12416)15538 General Services Agreement – Survey Services (2020) Contract C (12417)15539 General Services Agreement – Survey Services (2020) Contract D (12418)15540 General Services Agreement – Survey Services (2020) Contract E (12419)15541 Lower Meramec River System Improvements – Baumgartner to Fenton WWTF Tunnel (Design)15542 Lower Meramec WWTF Expansion Phase II (12255)15543 New England Town Cliff Cave Pump Station (P-323) Improvements (10715)15544 White Plains Sanitary Relief (Saltbox Dr to Cedar Creek Rd) (12280)15545 Emergency Repair 064 (Syracuse 738) (13567)15546 Wastewater Bonds Series 2020B Ordinance(Series 2020B)15547 2021 Bond Authorization Ordinance15548 Charter Change Ballot Initiative15549 Charter Change Ballot Initiative.Prop115550 Excess Funds Collection Services Ordinance15551 Forder Sanitary Interconnection (Forder Rd to Ringer Rd) (12180)15552 CSO Volume Reduction Green Infrastructure – American Cancer Society – Hope Lodge (13572)15553 CSO Volume Reduction Green Infrastructure – Andy’s Seasonings (13332)15554 CSO Volume Reduction Green Infrastructure – Beaumont Building (13450)15555 Hampton Creek Sanitary Relief (Deer Creek Trunk to Oxford Dr) Phase IA (Brentwood) (13405)15556 Hampton Creek Sanitary Relief (Deer Creek Trunk to Oxford Dr) Phase IA (Foss STL Swim School LLC) (13405)15557 Caulks Creek Forcemain (River Valley Rd to L-52) (11790)15558 DeGiverville Combined Sewer Improvements (11136)15559 Willow Hill Storm Sewer (Ladue 1614A) (12938) (1)15561 Union Road 100 Block Storm Improvements (10366)15562 CCTV Inspection and Physical Inspection of Sewers (2020) (12000)15563 Construction Management Services – Lower Meramec and Deer Creek Tunnels (11826)15564 Construction Management Services – Tank Treatment Pump Station Facilities (11151)15565 Professional Services Agreement – Engineering Services15566 Sentry Security Lease Agreement Ordinance15567 Investment Advisory Services (2)15568 White Coleman and Associates LLC (2)15569 Emergency Repair 065 (Lemay PS Number 1 108 Intake Line) (13582)15599 Modified Compensation Plan Ord Dec 2020 rev 4132115603 Salary of Executive Director 2020