Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My Public Portal
About
11.21.19 Neighor Notification Letter
111 Galen Street Sept 6
125-133 and 153-165 Lexington St., Sewer Main and Catch Basin, Aug 26
2018 Construction Season Information
2018 Flushing
2018 Flushing notice list2
20180821134012756
20180827144409345
2019 Recycle Calendar
2019 Recycle Events
20190205151240255
20191025121145900
20191113102258823
2020 Catch Basin Cleaning Press Release
2020 Road Presentation
20200313100427226
20200505104529891
20200601131848246
20200629102954305
20200831131320021
20201026154225556
2021 Permanent Patch Round 1
2021 Road Presentation Final
20210430084434737
20210430085245532
20210507121751166
20210708123748431
20210708135717801
20210721122602662
20210730113411110
20210810105100440
20210810130933825
20210816113853711
20210816113900878
20210827105220893
20210908110246847
20210929123939595
20211020133507545
20211108091309155
20220120113506015
746 Mt Auburn replace fire hydrant 1162020
Acton Buick Pilgrim replace water services Sept 8
Acton Pine Water Sept 7
Acton St and Bromfield St Water Service Aug 5
Acton St, Water Work Aug 3
Adams Street Selected Sidewalk Repairs (PDF)
Alden and Sheldon water services
Alden Rd Drain Manhole Dec 9
Alden Rd Gas Main Jan 2
Alden Rd Sheldon Rd Hazel St
Alden Rd., Jan 8 Install Plastic Gas Main
Alden Sheldon Hazel
Alden Sheldon Hazel Install Catch Basin April 27,28,29
Arden and Oakley Road Sewer and Drain Replacement (PDF)
Arden Road Residents and Abutters (PDF)
Arlington St Painting Nov 19
Arlington St Replace Hydrant Sept 12
Arsenal and School Install Gate Valve 1152020
Arsenal and School Install Gate Valve Apr 9
Arsenal betweek Irving and Taylor
Arsenal Park Line Painting
Arsenal St 92119 Saturday am work
Arsenal St Replace Hydrants and Gate Valves April 6
Arsenal St Replace Hydrants April 7
Arsenal St Replace Hydrants Update April 6
Arsenal St Replace Hydrants with locations
Arsenal St. Construction Notice_September - 2018
Avon and Sunset Temp Paving Nov 26
Avon Curbing Sidewalk Driveway Aug 10
Avon Rd Utility Replacement week of 923
Avon Rd, bypass water line, Oct 3
Avon Road Water on Bypass
Bailey near 86-90 Dec 21 sewer spot repair
Bailey Stoneleigh Sewer Repairs 10-22-20
Barbara Terr Water Shutoff May 13
Bartlett Everett, Water Services, Oct 28
Bartlett and Everett curbing sidewalks July 28
Bartlett Everett Avon Top Course Sept 17
Bartlett Test Pits April 24
Bates and Bates East Sewer week of Sept 30
Bellevue Rd Aug 31
Bellevue sewer repairs Nov 5
Bellevue, Gate Valve Fire Hydrant, Oct 22
Belmont Harrington Townly Sidewalk Handicap Driveway, Nov 4
Belmont Sewer Main May 14
Belmont Sewer Repair May 7
Belmont Sidewalk driveway and ramp June 22
Belmont St Gas Main Install Dec 12
Belmont St Sidewalk Maintenance, May 18
Belmont St, Fire Hydrant and Gate Valve, July 10
Belmont, Avon Alden Sheldon, Water Gate Valve and Main, Oct 15
Bigelow at Merrifield and 38 Elton
Bigelow at Merrifield and Elton
Bigelow Sidewalk Driveway Oct 30
Binder Course July 22
Binder Paving Sept 15 and 17
Birch Rd Water Pipe June 29
Birch Rd Water Service Pipe July 13
Boyd St Abutter Letter
Boylston Final Paving April 24
Boylston Street from Fairfield Street to 203-205 Chauncey Street, New Gas Main Installation (PDF)
Boylston Street Full Depth Reclamation 7-27-18
Bromfield St 10Aug
Burnham Bridham Chandler May 21
Capitol St, Sidewalks, Ramps and Aprons Aug 12
Carey Chapman and King Sewer Sept 16
Chandler Burnham Test Pits April 22
Chapman water services
Charles River Rd Feb 22 Replace section sewer main
Charles Rivere and Wheeler water
Church St Gate Valve Water Main July 15
CIP 2 Overview Map_202104021007125752
CIP Project 3 and 4 Flow Isolation 060421
CIPP 1 Week Notice - 7.26.21-7.30.21
CIPP week of 0908 0911
Cleveland, Jefferson Sewer Sept 16
Columbia and Common Water Nov 9
Columbia St Milling June 24 25
Columbia St, Sidewalk, May 16
Commitee on Public Works Mt. Auburn St 10-30-2018
Committee on Public Works Mt. Auburn St 10-16-2018
Common St Construction Update
Common St Construction with Map
Common St Rd Const Notice
Common St Road Const April 8
Common Street Crosswalk Work 10-24-20
Common Street Full Depth Reclamation 7-26-18
Common Street Reclaim and Pave Notice 080219_1
Common Street Sept 8 paving
Common Street Traffic Advisory
Common Street Update
Common Street Work Update Notice
Common Street, Road Const., Aug 10
Commonwealth Maplewood Templeton Keenan Norseman Paving Sept 25
Commonwealth Maplewood Templeton Kennan Norseman
Commonwealth Rd Oct 9
Commonwealth Road
Conant Rd Gas Main Feb 18
Concord Road Sept 25 night work
Coolidge Ave Arlington St
Cottage and Lyons Sewer March 30
Cottage_and_Lyons__St._Sewer_Project
Cranshaw Arsenal Work Sat AM
Cranshaw Overnight Work May 8-9
Cross Street April 30 sidewalk ramp
Crosswalk Improvements
Curbing and sidewalk Lorusso Aug 24
DCR 07032019
dcr 07082019
DCR Advisory Overnight Work
DCR Mt Auburn Street 915 916
Des Lex Ban Paving May 26 27
Desmond Lexington Bancroft
Dexter Ave Sidewalk Drive Ramp Repair
Downey Loomis Install Catch Basin April 28
Downey St_202010081554523489
Downey Street Gas Main Installation (PDF)
Duff, Grant Pierce Nat Grid Mar 9
Edenfield Avenue Binder Course of Road Pavement to Begin Tuesday, August 29 (PDF)
Edenfield Avenue Residents and Abutters Reclamation of Road Scheduled for August 15th (PDF)
Edgecliff Sidewalk Apron Install Nov 30
Edgecliff Sidewalk Apron Install Nov 8 9
Edgecliff Sidewalk Apron Oct 29 30
Edgecliff Westland and Woodleigh Road Work
Edgecliff Westland Woodleigh Sept 10
Edgecliff Westland Woodleigh sidewalk April 1
Edgecliff Woodleigh Westland Templeton Asphalt April 17
Elmwood Ave Water Work Thurs 1112
Elmwood Goldie Gertrude Catch Basin April 12
Emerson July 16 sidewalk maintenance
Essex Nash Pine Water Services July 27
Evans Water Service Shut July 27
Evans May 12
Evans May 13
Everbridge Snow Emergency Announcement 02.01.2021
Everett and Bartlett Street Sept 7
Everett and Malden Oct 4
Everett Ave Driveway Apron Sept 15 17
Everett Ave Driveway Apron Sept 13 14
Everett Ave Malden Street Binder 7-31-18
Everett Ave Sidewalks on August 24, 2018
Eversource milling-paving Arsenal No Beacon
Eversource tree prune Oct 16 and 18
Excavate Test Pits Dec 15
Fairview Avenue Selected Sidewalk Repair (PDF)
Fairview Sidewalk Driveway Ramp July 16
Fayette and Pearl Streets Sidewalk driveway and handicapped
Filippello Park Fence 10292020
Filippello Park Fence Replacement
Final Asphalt Walnut Nichols Grove Calvin April 21 22
Final Asphalt, Coolidge and Arsenal, April 20
Fitchburg Fire Hydrant Mar 26
Fletcher April 13 water service pipe
Flushing
Flushing by week
Flushing Week 4_202010091215085660
Flushing week of 0928
Flushing week of 10-19
Flushing Week of 10-26
Flushing week of Sept 21
Frank and Louise St
Frank Louise Catch Basin Aug 24
Frank Louise Pipe June 2
Frank St Sewer week of sept 30
Frank St Water Gate Oct 9
French Lexington North Park and California
French Lexington North Park California Paving Sept 23
Galen Maple St Water Work
Galen Maple Street Water Main 942018
Galen Maple Streets Sept 6
Garnet Oct 4
Garnet sidewalk July 8
Gertrude Goldie Elmwood Grandview
Gilbert St, Handicap Ramps, July 31
Gilbert Street, Sewer System Repairs (PDF)
Grandview Install Catch Basins April 21
Grandview and Chapman Streets (PDF)
Grandview Ave Fire Hydrant Nov 18
Grandview, Replace water gate valve April 30
Grant Avenue, Chapman, Gleason and Emerson Road, Final Asphalt Surface (PDF)
Green St Abutter Letter
Grove St and Kondazian sidewalk ramps and aprons Oct 17
Grove St, Coolidge Hill Rd Milling May 17
Grove St, Coolidge Hill Rd, Asphalt, May 28_1
Grove St, Coolidge Hill, Final Asphalt, May 29
Hancock, Chauncey and Boylston Street, Replacement of Miscellaneous Water Services and Hydrants (PDF)
Harnden Lex Warren Webster Wayne milling Oct 17
Harnden Lexington Warren Webster Wayne Asphalt Nov 28 29
Harnden, Sewer Main, May 13
Hazel Street and Abutters Water Main Project (PDF)
Hazel Street Residents and Abutters (PDF)
Highland and Grandview water services Aug 24
Highland Ave Excavate Wtr Main Mar 30
Highland Chapman Grandview Sewer Sept 19
Highland Chapman Grandview Sewer Sept 23
Highland Lex to Olney Water Main Apr 7
Highland Water Main Replacement Mar 29
Highland, Gilbert, Charles, Prescott replace water main valves Mar 30
Hillside Roadd from Upland Road to Maplewood Street Concrete Sidewalk Repairs (PDF)
Hosmer curbing sidewalk and sidewalk April 1
Hosmer Ped Plan Construction Update
Hosmer Road Work Update 10518
Hosmer Safe Routes Final Paving May 11
Hosmer Safe Routes May 3
Hosmer_Safe_Routes_to School - Final Paving (Postponed), May 4
Hosmer_Safe_Routes_to_School_Project
Hovey Street and Abutters Final Asphalt Surface (PDF)
Hovey Street Driveway Repair Work (PDF)
Hovey Street Granite Curbing, Concrete Sidewalks and Driveway Aprons (PDF)
Howard Pleasant Acton March 8
Hudson Street Residents and Abutters (PDF)
Hunt Maple at Galen Water Main May 1
Hunt Maple Galen Water Main April 30
Hunt St Gas Main const Sept 30
Hunt St Oct 3
Hunt St Water Project Notice
Hunt, Maple, Galen, Phillips Paving June 4
Hydrant Flushing FAQ
Hydrant Leak Detection Survey Sept 28
Insituform Jan 14 School Arsenal
Insituform Tech Watertown Notices Week of 03.15.21
Insituform Technologies FAQ
Insituform Week of 04.05.2021
Insituform week of mar 8
Insituform week of Mar 8-2
Insituform week of Mar 8-2_1
Install final asphalt multiple streets, April 6
Irma Avenue Full Depth Reclamation (PDF)
Irma Avenue Paving to Begin September 28th (PDF)
Irving Water Work July 29
Kimball Curbing Sidewalk Dway Install 917
Kimball Nichols Frank Louise
Kimball Rd Nation Grid gas main July 29
Kimball, gate valve hydrant, Nov 4
Kimball, Replace sub std water lines, Nov 4
Knowles and Holly Street Residents (PDF)
Knowles Road and Whitcomb Street (PDF)
Knowles Road, Holly and Whitcomb Streets (PDF)
Knowles Road, Whitcomb and Holly Street Residents Final Asphalt (PDF)
Knowles Road, Whitcomb and Holly Streets (PDF)
Knowles Road, Whitcomb Street, Holly Street and Abutters (PDF)
Laurel Street and Quimby Gate Valve Replacement (PDF)
Laurel, Quimby Streets, and Abutters (PDF)
Lexington at Main Gas Night Work
Lexington Highland Warren Water Main April 7
Lexington St Gas Main April 3
Lexington St gas main install Feb 5
Lexington St Grinding and Paving July 29 Aug16
Lexington Village Hosing
Lexington_St.Gas_Main_Project
Lloyd Clayton sidewalk ramp apron May 13
Louise Fire Hydrant Oct 9
Louise Street - New Gas Main Installation (PDF)
lovell Bellevue Locke Fire Hydrant Dec 2
Madison Nyack repair sewer Sept 9
Main Essex Nash Water July 30
Main Nov 18 Utility Work
Main replace fire hydrant July 14
Main St Mill Pave Nov 13
Main Street Pedestrian Safety Improvements
Maple Hunt Streets Water Line Work
Maple St, Sidewalks, Ramps, Aprons, Aug 12
Maplewood Commonwealth New Fire HydrantSept 24
Maplewood Saturday Work
Maplewood St
Maplewood St Trench Oct 4
Maplewood Swalk Dway Oct 18
Massachusetts Emergency Management Agency Statement Oct. 32018
Milling Multiple Streets May 18 19
Milling Notice 072021
Milling, Multiple Street, May 19 20
Misc streets milling Sept30 Oct1
Miscellaneous Driveway Apron Repairs (PDF)
Mount Auburn and Cottage Street, Installation of New PVC Telecommunications Conduit (PDF)
Mt Auburn Hydrant replace 952018
Mt Auburn Phillips Sept 6
Mt Auburn Phillips St Sept 6
Mt Auburn Phillips Water Work 9-11-18
Mt Auburn Phillips Water Work Sept 11
Mt Auburn Prentiss Keenan Fire Hydrant Dec 3
Mt Auburn, Fire Hydrant Gate Valve April 23
Multiple Street Milled Mar 29 30
Multiple Streets final asphalt July 12-13
Multiple Streets Final Asphalt Oct 13-14
Multiple Streets, May 5 repair streets.
MWRA Irving Street Dec 6
Nash, Jensen, Pine Water Work July 29
Nat Grid Abutters
Nat Grid Arlington St Abutters
Nat Grid Beechwood
Nat Grid BRADSHAW ST
Nat Grid Francis St Abutter Letter
Nat Grid Lovell Rd
Nat Grid Lovell Rd Wat Abutters
Nat Grid N Beacon St Abutter Letter
National Grid OAK ST Abutters
Newsflash Last Household Hazardous Waste Collection Announcement
NG George St
NG Nash St Nov 30
NG Pine St Nov 30
NG Wilson Ave
NG Winter St Nove 30
Nichols Ave Install Granite Curb April 19
Nichols Ave, Replace Water Gate, Oct 23
Nichols Ave., Water Service, Oct 7
Nichols Avenue Sewer System Repairs (PDF)
Nichols Dexter Drainage April 29
No Beacon St Jan 7 Replace Water Gate Valve
Norseman Ralph Piteri Terr Sidewalk Oct 9
Notice to Neighbors 9-14-18
Nyack St, Fire Hydrant and Gate Valves, July 11
Oak St install gate valves Sept 8
Oak St Sept 28 Water
Oakley Fuller Edenfield Quirk Chestnut
Oakley Fuller Edenfield Quirk Chestnut Paving Sept 24
Oakley Templeton Keenan Norseman, Paving, Oct 2
Olcott water service replacement July 13
Oliver Rd Sewer Main May 6
Olney Gilbert water services July 30
One-Week Notice - Watertown - 20-01S - Updated
Orchard Spring Reclaim March 31
Orchard St Ext Spring St Paving, April 8
Parker St repair sidewalks April 15
Partridge Stuart Andrew Water Services
Perry at Harrington sewer Nov 17
Phillips Street Hydrant Letter
Phillips Street Water work
Phillips Water Line Oct 23
Phillips Water Line Sept 21
Phillips Water Main April 30
Phillips Water Main May 1
PIDC CONST, After Hours Work, May 29 - Jun 14
Piermont and Tappan, Water, August 19
Piermont Tappan Curbing Sidewalk and Driveway Mon June 22
Pine Essex Nash Oak Borings April 22
Pond Street and Abutters (PDF)
Poplar St Sidewalk Dway Ramp
Poplar Street Sidewalk Driveway Ramp Sept 14
Priest Road and Abutters Homeowner Approval and Entry Into Your Home (PDF)
Priest Road and Abutters Update to Road Work (PDF)
Priest Road Sewer Main Replacement Begins September 25th (PDF)
Putnam Hosmer repair May 21
Quimby and Hazel Street and Abutters (PDF)
Repair Storm Drain Berkeley St Dec 12
Replace fire hydrant Fairview Mar 30
Riverside Nights Abutter Letter
Riverside Water Line Sept 20
Road Closure, No Beacon at Irving May 18-20
Robbins Fire Hydran replace Aug 26
Robbins Rd Ext Replace water gate Apr 22
Robbins Rd Ext Sewer and Drain Mar 16
Robbins Rd Ext sidewalk dway repairs
Robbins Rd Sewage drainage April 15
Robbins Rd, Plastic Gas main, Nov 7
Rose and Harnden final asphalt May 6
Rosedale, Evan, Andrew Longfellow Belmont milling May 21
Rosedale, Evans, Andrew, Longfellow, Belmont Final Asphalt, May 31
Salisbury Rd Jan 16 Hydrant Replace
School St install manhole Dec 3
School St Oct 22 Install Drain Manhole
Sheldon Rd Sewer Spot Repairs April 8
Sheldon Rd, New Plastic Gas Main, Feb 18
Sidewalk and Driveway Repair 183 School Street
Snow Emergency Announcement 12162020
Snow Event Specification Final
Snow Plow Contractors Agreement 2021
Sparkill Duff Belmont Sycamore Rose Harnden Milling April 26
Sparkill Grant Water Gate Sept 27
Sparkill Grant, Water Replacement Project, Aug 5
Sparkill Piermont, Fire Hydrant, July 8
Spring Street from Main Street to 31 Spring Street, New Gas Main Installation (PDF)
Spruce St Sewer drainage 1112
Standish Fire Hydrant gate Mar 25
Stormwater_Advisory_Committee_PublicMeeting_Notice
Styrofoam and Shredding
Summer Maude Water Repair May 11
Summit replace fire hydrant
Sunset Rd Water Mains Oct 21
Sunset Rd, Water Gate, Oct 1
Sycamore and Belmont Milling Oct 22
Sycamore and Belmont Sts Milling Oct 19
Sycamore Belmont St Asphalt Nov 28 29
Sycamore Sewer spot repair Nov 19
Sycamore Street, Final Asphalt Surface (PDF)
Tappan and Piermont, Water Line, July 15
Templeton Sidewalk Apron April 2
Three Week Look Ahead Complete Streets
Three Week Look Ahead Watertown Phase 1 and 2
Thurston and Charles River Rd Water Main Oct 17
Thurston Charles River Water Oct 18
Top Course Paving
Top Course Paving Aug 21
Town Of Watertown Adopt an Island Brochure
Tree Hearing 08072019
Trees_ClimateChg_Poster-1
Walnut Nov 17 Water Work
Waltham Street Abutters (PDF)
Waltham Street Construction (PDF)
Waltham Street Residents (PDF)
Waltham Street Residents Driveway Repair Work to Begin (PDF)
Warren Desmond sidewalk
Warren St at Cunniff
Warren Water Shut Down Mon July 13
Washburn, Spring, Fayette and Watertown, Final Asphalt May 30
Washburn, Spring, Fayette, Watertown Milling May 20
Washburn, Spring, Fayette, Watertown, Asphalt, May 29
Water Main Replacement, June 27, Tappan - Piermont
Water Svcs replace Sept 22
Watertown CIPP Schedule 3.16.20-9.20.20 - update
Watertown Hazard Mitigation Public Meeting Flyer - Jan-08-2018
Watertown notices
Watertown Notices Week of 03.22.21
Watertown Notices Week of 03.29.21
Watertown Phase 1 and 2 Three week look ahead
Watertown Tree Hearing List 2619
Waverley asphalt sept 30
Waverley Ave aug 9 Road Reclaim
Waverley Ave Replace fire hydrant and gate April 15
Waverley Hydrant replace April 8
Week of 0301 Work Plan
Week of 0615 Work Plan
Week of 0622 Work Plan
Week of 0629 Work Plan
Week of 0706 Work Plan
Week of 0713 Work Plan
Week of 0720 Work Plan
Week of 0727 Work Plan
Week of 0803 Work Plan
Week of 0810 Work Plan_1
Week of 0817 Work Plan
Week of 0823 Work Plan
Week of 0824 Work Plan
Week of 0831 Work Plan
Week of 0921 Work Plan Revised
Week of 1101 Work Plan
Week of 1129 Work Plan
Westland Rd sidewalk and apron Oct 16 17
Westland Road, Woodleigh and Edgecliff Road and Abutters (PDF)
Westland Sidewalk Oct 24 25
Westminster, swalk dway ramps June 26
What styrofoam can be recycled
Wheeler Court Repair Water Leak June 8
Wheeler CRiver Water Piping
Wheeler curbing sidewalks Oct 29
Wheeler Lane
Wheeler Lane (2)_1
Wheeler Ln Gas Main May 28
Wheeler Rd Charles River Rd Oct 9
Whites Ave Const Project Wk May 11
Whites Ave, Nat Grid Gas Main, Mar 9
Whites Sidewalk May 26
Winter St Abutters
Winthrop July 28
Woodleigh Edgecliff Sidewalk Dway
Woodleigh Rd sidewalk apron Nov 14
Woodleigh Sidewalk Apron Nov 27-28
Wtown St Milling June 24
York Ave Replace Sewer June 19
York Ave Sewer Aug 31
York Ave Sewer Spot Repair Dec 18
York Sidewalk Driveway June 30
Yukon 25 Bigelow